Browse
Search
Agenda - 04-30-2002 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 04-30-2002
>
Agenda - 04-30-2002 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 2:55:40 PM
Creation date
8/29/2008 10:38:15 AM
Metadata
Fields
Template:
BOCC
Date
4/30/2002
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 20020430
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> APIN z NO2 <br /> Pam xnM <br /> Ppailola <br /> Upon Measure approval HadenSMm Wl dmSde OI pans am <br /> spetlOratlons along ends w=a mountain aMM ted Or Omge COUMY to <br /> M0,axaltl ads cm Nd Um Mould. <br /> a Pripae and wtmil Pad]ea to RpulNOry egence6 fig tNP review end <br /> appnval <br /> Pxaee 8no-61d01 n0 and Awand <br /> RMax M6y leP elN wld nneka n[emmMdetlpl5 or aead <br /> Phase Senn-Content AdMinit W <br /> HaeenSlaiman no ubX Me and al your MI appmplale to the 9 o <br /> ofmnatrv4lon Of as dxemMe opened Sy NadenMSnEle In s Mb <br /> eemme kminrWAM1 the programs and quip Of ME wA and to <br /> Oeklrme In gmenl lithe work IS pncoodlM in a¢M with the <br /> Current OnCUmen. This wads is oplloral and tall Me WIWIII if <br /> Wifa0d(me atechW SeOWQW) <br /> NO* All conpnNon drawings ads Mailing We be in ACWad <br /> 111. COMPENSATION <br /> CompanaYOn for these eeMres Orders ahow WI M be a 1=9 own me basis as <br /> toMIS In mwrdsnce won the aMNed General Tenor am COMiMMl <br /> FEE <br /> Phase l-She Tour and EwMAOn larin.00 <br /> Phase ll-Review V Proposed PeM1 FwIMSS 114.0"(f) <br /> Phase ill-Skstsx Dome 31.11400 <br /> Phase V.Oreft COndeyml Congo VROLw <br /> Phase V-P211mInary She Plan 140,0010m <br /> Phase Vl-SId01n0 and AweN wo.00 <br /> Phase Vll-COMnq AdMN9rallan(Opt Hourly <br /> TOTAL ME IC SCOPE OF SERVICE 127,120,00 <br /> Compensation for thon EnNres beyond the scope Of xMne OWircd aaeve no be On Me <br /> ban of actual lire exparded not In esmed Me often IISIM numeers nd Me ARMW General <br /> TMma and Conchlora. In adNlloq N OW Of pOGRI"non MUtl be Mowed in ax""wM <br /> Ne Mmm:J Gomel Tams and Cm6,p00a wMM Mould to t"mMo MW by Mwenn <br /> The AM Wsd aoow area W Gutted to ranagOrMM YMBr re bYewrg wundonow <br /> A. hire some,crew imed charge;resteAOY,and)ord gn must an requhad <br /> tnyond the original apprte'M plena. <br /> e, ItamacM awna allow pavnm haw ram seen mrykee wage MNeCn manes <br /> core deumf rl.popmau <br />
The URL can be used to link to this page
Your browser does not support the video tag.