Orange County NC Website
T <br /> rr,11iI Will The Inelrsd dodo of apprmrel w Mie maps Is ad funnies: <br /> • c Of pansMtkn bar bulking Wry Is estimated at$B mlilon.This cost would be funded through <br /> abemawe funding maohenams,such as C+atblmfes of ParNolpation(OAPst ore private pleoerreM <br /> loan. <br /> • <br /> although design consdpfagons for River Park will W included in Me scope W the work,aly <br /> Catlmendanans ma ang the actual devalopmem walla be considered as a senerats vas item. <br /> d design mr the talking only Is a&imeted N 1 o-12%of mmnual vaster aPPM m l <br /> $BW,WDEIOD,ogo. Thessfunds have been eppfophated over the peM Mw yeas in Me Cii <br /> Invzalments Plen(CIP). happroved,metforthe expanded but member pan would aso be oharged <br /> epalw these funds. <br /> Specdc beat impkcelichm for each d Made ImMiifies will be Misstated for Bead apparel,as they <br /> become khan. <br /> RMIMMEeIBAMelft The Manager recommaks that Vs Board <br /> • Appove the expanded mercer plan more and alMove the Cbemor M Purchasing and Cenvel <br /> SBMM to negotiate a cossi for Bond approval with FraaremWhhe Archheos;and <br /> • Enctrat Me propmed planning praceae;eM <br /> • Make appammens m the Mree ask groups as manbal above,Moluding the designation of Nw <br /> Cauchy Commiaaonim who will serve;and <br /> • Authorities Me OireMCra Pumluvng and CMuah fImmoes to sblist proposes for detlgn wrvfnss for <br /> she Juafea Feelings Expan ion Prop t,Phase I. <br />