Browse
Search
2023-058-E-AMS-Progressive Design Collaborative-Professional design for the WCOB server room HVAC system design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-058-E-AMS-Progressive Design Collaborative-Professional design for the WCOB server room HVAC system design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:36:00 PM
Creation date
2/9/2023 3:35:46 PM
Metadata
Fields
Template:
Contract
Date
2/7/2023
Contract Starting Date
2/7/2023
Contract Ending Date
2/9/2023
Contract Document Type
Contract
Amount
$6,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />pdcengineers.com <br /> <br /> <br /> <br /> <br />December 14, 2022 <br /> <br /> <br />Angel Barnes <br />Capital Projects Manager <br />Orange County Asset Management Services <br />306 Revere Road, A102 <br />Hillsborough, NC 27278 <br /> <br />Re: HVAC Upgrades <br /> <br /> <br />Angel: <br /> <br />Thank you for asking Progressive Design Collaborative to work with Orange County again. Based on the walk <br />through we performed and the information to date I am proposing the following: <br /> <br />Court Street Annex: <br />• Replace the MDP panel in its current location <br />• Budget: $130,000 + $15,000 in contingency <br />• Fee: $13,000 <br />• Bid Documents complete: March 2023 <br />• Construction: March 2024 <br /> <br />Motor Pool and Maintenance Shop: <br />• Add ATS and Main building <br />• Rework circuits/breakers to eliminate the manual breaker switching required <br />• Add new generator and ATS for the Transportation office. <br />• Use existing generator for Maintenance shop and install new ATS <br />• Budget: $350,000 + $50,000 in contingency <br />• Fee: $30,000 <br />• Bid Documents complete: March 2023 <br />• Construction: March 2024 <br /> <br />Whitted Complex: <br />• Replace air cooled chiller <br />• Replace 2 condensing boilers <br />• Replace all chilled water and hot water pumps <br />• New DDC <br />• Replace one AHU completely <br />• Replace the coils, fans, dampers, etc in two built-up AHU’s <br />• Replace elevator equipment room unit <br />• Replace about 5 ductless splits <br />• Replace approximately 50 vav boxes <br />• Budget: $1,600,000 + $100,000 in contingency <br />ATTACHMENT "A" <br />DocuSign Envelope ID: 1EFCC244-A3A7-467C-A26F-3A7F8FF00516
The URL can be used to link to this page
Your browser does not support the video tag.