Browse
Search
2023-016-E-AMS-Summit Design and Engineering Services-Orange County pavement management program phase 1 comprehensive plan development
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-016-E-AMS-Summit Design and Engineering Services-Orange County pavement management program phase 1 comprehensive plan development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2023 11:41:09 AM
Creation date
1/17/2023 11:40:28 AM
Metadata
Fields
Template:
Contract
Date
1/17/2023
Contract Starting Date
1/17/2023
Contract Ending Date
1/17/2023
Contract Document Type
Contract
Amount
$27,600.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />1 Week <br />We come to the table with open minds, not preconceived ideas, to listen and understand. <br />PHASE 1 – INFORMATION GATHERING, EXISTING CONDITIONS EVALUATION, AND PROJECT VISIONING <br />Kickoff Meeting <br />We start where you are. A kickoff meeting will be conducted between Orange County and <br />Summit. Understanding the history and process that led up to the project will connect us. <br />Every project has a vision beyond its evident purpose. Being able to extract that information <br />and harness it will generate ideas to bring that vision to fruition. <br /> 1 Month <br />Information Gathering <br />Before any work begins, we understand that a successful <br />project cannot be fully achieved without a thorough and <br />complete investigation of the existing conditions. Gathering <br />information is a necessary first step and cannot be overlooked. <br />For most information that cannot be found, we can perform.1 -2 Months We have the capability to generate necessary <br />surveys or perform subsurface conditions through <br />geotechnical investigation and reporting if needed. <br />Existing Conditions Evaluation <br />Visioning Meetings <br />From here, the process continues with visioning. <br />This is where we collect what we know and have <br />future-focused discussion. Visioning meetings <br />will allow all stakeholders to share their ideas <br />for the project. This will be tailored to how far <br />you want to take it. <br />2 Weeks <br />PROJECT TIMELINE <br />DocuSign Envelope ID: C184AD78-4B0F-4094-BB2A-3E82CEE7D0AC
The URL can be used to link to this page
Your browser does not support the video tag.