Orange County NC Website
9 <br />SIMILAR PROJECTS <br />Locate and Assess <br />Summit completed a town-wide stormwater infrastructure inventory to identify all stormwater facilities in Youngsville. The Summit team created an ArcGIS Collector database to utilize for field data collection of all stormwater facilities within the Town right of way. Summit inventoried, assessed, and analyzed the complete stormwater drainage network. <br />Cost at Bid: xxxCompleted Cost: xxx <br />Town of YoungsvilleErin Klinger, CZO, AICP(919) 925-3395 <br />Ongoing <br />Town of YoungsvilleStormwater Assessment(Youngsville, NC) <br />Services Provided ProjectDescription ContactInformation Year CompletedProject Name (Location) <br />CMT/SILaboratory Testing <br />Summit is providing CMT/SI services for the new two-story,  46,962 SF classroom addition and new parking lot area at  Cedar Ridge High School. <br />Cost at Bid: $11,800,000.00Completed Cost: $11,800,000.00 <br />Orange County Schools  Roger Ivey(919) 732-8126 <br />2019 <br />Cedar Ridge High  School Addition  (Orange County, NC) <br />Geotechnical Engineer of Record  CMT/SILaboratory Testing <br />Summit provided geotechnical and CMT/SI services for the  approximately 46,000 sq ft new facility including parking areas  and access driveways. <br />Cost at Bid: $7,000,000.00Completed Cost: $7,000,000.00 <br />Hubrich Contracting, Inc.Steve Hubrich  (919) 471-2895 2016 <br />Uwharrie Academy  (Randolph County, NC) <br />S Cost at Bid: $ Completed Cost: $Locate and Assess <br />Summit completed multiple stormwater assessments for Orange County for an RFQ awarded in 2019. The properties included in these assessments are the Board of Elections (BOE) building, the Sheriff’s Office, the Whitted Complex, and a Transportation Administration Building. <br />Cost at Bid: $10,000.00Completed Cost: $10,000.00 <br />Orange CountyAngel Barnes 2020 <br />Orange County Stormwater Assessments(Orange County, NC) <br />Condition SurveyContract DevelopmentContract Administration and Oversight <br />Summit team members identify contract resurfacing and pavement preservation route selection based on 5-year budget projections, covering 2,500 miles. Our team collects field data for contract development and determines the best treatment for each route prior to contract advertisement and award. During this process Summit has streamlined the data collection procedure from paper field notes to Cloud-based data collection. This has drastically improved lead times for contract preparation and significantly reduced overruns during construction. Once the data is collected our team completes the contract preparation for advertisement and award. <br />Cost at Bid: $43,476.00Completed Cost: $43,474.25 <br />NCDOT Randy Finger, PE(919) 825-2650 Ongoing <br />NCDOT Division 5 Resurfacing Data Collection and Contract Development (NCDOT Div. 5) <br />DocuSign Envelope ID: C184AD78-4B0F-4094-BB2A-3E82CEE7D0AC