Browse
Search
2023-006-E-AMS-WB Brawley Company-WCOB 3rd floor renovations credit for wallcovering
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-006-E-AMS-WB Brawley Company-WCOB 3rd floor renovations credit for wallcovering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2023 9:46:31 AM
Creation date
1/6/2023 9:46:16 AM
Metadata
Fields
Template:
Contract
Date
12/28/2022
Contract Starting Date
12/28/2022
Contract Ending Date
1/6/2023
Contract Document Type
Contract
Amount
-$841.81
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AAA PAINTING DRYWALL <br />Project:Proposal #: <br />GC:Project #: <br />Contractor:Contractor #: <br />SUBTOTALS <br />1. Total Direct Cost of Materials $200.00 <br />2.5% $10.00 <br />3.7.25% $14.50 <br />4.$50.00 $274.50 <br />5. Total Direct Cost of Labor $375.00 <br />6.5% $18.75 <br />7.30% $118.13 $511.88 <br />8.$0.00 <br />9.10% $0.00 $0.00 <br />10.$0.00 <br />$0.00 <br />$0.00 <br />11.2.5% $0.00 $0.00 <br />($786.38) <br />12.0.0%$0.00 <br />($786.00) <br />Time Extension Request:1 day(s). <br />Date: ________________10/13/2022 <br />Date: ________________ <br />Date: ________________ <br />Labor Burden <br />Approval Recommended by Design Consultant: ________________________________ <br />TOTAL OF CHANGE PROPOSAL <br />Owner's Representative Approval: ____________________________________________ <br />Overhead & Profit on Item 8. <br />Subtotal of Proposal <br /> Schedule Activity # Affected: <br />Contractor's Signature: ___Eder Araujo__________________________________________________ <br />Materials (Attach list with Qty, Item, Unit $, Unit mh, Total mh, OT mh, Total $) <br />CHANGE PROPOSAL FORM <br />Description of change: <br />Equipment <br />Labor <br />Subcontractors <br />Subcontractors (Include quotes with material & equipment backup) <br />Equipment Costs <br />Deduct original wallcovering <br />West Campus Office 3rd Floor Upfit <br />Brawley Co. <br />AAA Painting & Drywall <br />3 <br />2022108 <br />The Contractor agrees to perform the work outlined in this change proposal for the amount specified above and in <br />accordance with the Contract documents if the work is authorized by the Owner. <br />Bonds (% of subtotal of proposal) <br />Sales Tax <br />Overhead & Profit on Item 1. <br />Overhead & Profit on Item 10. <br />Shipping & Transportation <br />Overhead & Profit on Item 5. <br />DocuSign Envelope ID: D704809F-D65E-4E2D-9B85-B21A752AFDFE
The URL can be used to link to this page
Your browser does not support the video tag.