Browse
Search
2023-004-E-AMS-HH Architecture -Amendment #4 WCOB renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-004-E-AMS-HH Architecture -Amendment #4 WCOB renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2023 9:45:06 AM
Creation date
1/6/2023 9:45:00 AM
Metadata
Fields
Template:
Contract
Date
1/3/2023
Contract Starting Date
1/3/2023
Contract Ending Date
1/6/2023
Contract Document Type
Contract
Amount
$500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 1 of 1 <br /> <br /> <br />January 3, 2023 <br /> <br /> <br />Alan Dorman <br />Director, Asset Management Services <br />Orange County Government <br />131 West Margaret Lane, Suite 300 <br />PO Box 8181 <br />Hillsborough, NC 27278 <br /> <br />Re: Orange County West Campus Office Building – 3rd Floor Renovation – <br /> Amendment #4 <br /> HH Project Number: 21-094 <br /> <br /> <br />Dear Mr. Dorman, <br /> <br /> <br />HH Architecture is pleased to present this Amendment #4 for professional design services for the West Campus 3rd <br />Floor Renovation project. <br /> <br /> <br />Amended Scope <br /> <br />The County has charged our team with some additional post-occupancy Design and Construction <br />Administration work for the WCOB project. This fee includes a follow up site visits and additional <br />construction administration services. <br /> <br /> <br />Fee <br /> <br />For the scope detailed above, we propose an additional lump sum fee of Five Hundred Dollars ($500). <br /> <br /> <br />Please let me know if you need additional information. We are excited to continue our work for the <br />County on this project. <br /> <br /> <br /> <br /> <br /> <br /> <br />David Carey, LEED AP <br />Principal <br />DocuSign Envelope ID: C05A3CC5-F788-4E51-B35C-E2C53B886A5E
The URL can be used to link to this page
Your browser does not support the video tag.