Orange County NC Website
| 32 <br />5. Similar Projects <br />RHA Health Services, <br />Burlington Facility Based Crisis Center <br />Burlington, NC <br />CPL was approached by RHA Health Services to assist <br />with planning and design efforts on a new 16-bed <br />Facility Based Crisis Center located in Burlington, <br />NC. The FBC is going to occupy three spec office <br />buildings totaling 20,000 square feet currently under <br />construction. The largest of the buildings will house <br />an Adult/Adolescent Urgent Care, support service <br />areas, and the 16-bed unit consisting of single and <br />double occupancy rooms. CPL worked closely with <br />the developer to ensure the building’s construction <br />type and structural systems would meet all applicable <br />codes for an I-2 occupancy, as well as all DHSR <br />licensure requirements. <br />The other buildings will provide outpatient counseling, <br />education, and an on-premise pharmacy. The campus <br />will serve as a hub to provide the needed behavioral <br />healthcare to the local community, while at the <br />same time reduce the burden put on local hospitals <br />emergency departments and law enforcement <br />agencies. <br />PROJECT DETAILS <br />Size: 20,000 sf <br />Completion Date: 2021 (Concept <br />Design only) <br />Construction Cost: $5,000,000 Est. <br />Design Team: A. Chahulski <br />Client Reference: Sandy Feutz – <br />Chief Operating Officer, RHA Health <br />Services; 828.775.1264 <br />SCALE:7/1/16 <br />WILKES FBC PERSPECTIVE <br />Vaya Health (Formerly Smoky Mountain Center), <br />Wilkesboro Facility Based Crisis Center Study <br />Wilkesboro, NC <br />CPL worked with Vaya Health to raise awareness in North Wilkesboro <br />through community engagement sessions for the purposes of obtaining <br />funding to construct a new Facility Based Crisis Center. The proposed <br />plans were for a 20-bed facility that would be an addition to an existing <br />outpatient behavioral facility, as well as Adult Urgent Care. <br />PROJECT DETAILS <br />Size: 9,000 sf <br />Completion Date: 2016 <br />Construction Cost: 2,700,000 Est. <br />Design Team: A. Chahulski, D. <br />Scesney <br />Client Reference: Genny Pugh – <br />Senior Director of Community <br />Collaboration, Smoky Mountain <br />Center; 828.275.1034 <br />DocuSign Envelope ID: 1920B089-58AA-4E97-8225-7BCF8DEBAAD4