Browse
Search
2023-002-E-AMS-CPL + RHA-PreDesign for Behavioral Health Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-002-E-AMS-CPL + RHA-PreDesign for Behavioral Health Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2023 9:23:04 AM
Creation date
1/4/2023 9:22:06 AM
Metadata
Fields
Template:
Contract
Date
12/19/2022
Contract Starting Date
12/19/2022
Contract Ending Date
1/4/2023
Contract Document Type
Contract
Amount
$172,325.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
| 22 <br />Jack Grabowski <br />PE, LEED AP, HFDP <br />Lead Electrical Engineer RMF – Raleigh, NC <br />Mr. Grabowski is an electrical engineer with over 22 years <br />of healthcare expertise, working directly with clients and <br />contractors to solve complex electrical problems. He is <br />adept at effectively training and leading comprehensive <br />teams, master planning, assessing aging facilities to <br />replace their infrastructure, and coordinating site utilities. <br />Mr. Grabowski graduated from the University of Maryland, <br />College Park with a Bachelor of Science in Electrical <br />Engineering with a power engineering focus. He is a <br />Professional Engineer, LEED Accredited Professional, and is <br />active with IEEE for which he has taught classes since 2008. <br />Cape Fear Valley Health <br />New Harnett Health Medical <br />Office Building and Cancer <br />Center Upfit <br />Hopkins Sibley Memorial <br />Hospital <br />New Medical Office Building* <br />LifeBridge Health <br />Carroll County Memorial <br />Hospital Nursing <br />Administration Office Suite <br />Renovation <br />University of Maryland <br />Medical Center <br />New Laurel Medical Facility <br />University of Maryland <br />Medical Center <br />New Capital Region Medical <br />Center <br />Calvert Health <br />Emergency Department <br />Triage Renovation <br />Beebe Healthcare <br />New Outpatient Surgery <br />Center* <br />MedStar Health <br />Mary Washington Healthcare <br />Cancer Center Transformers <br />Hopkins Sibley Memorial <br />Hospital <br />New Patient Tower* <br />Beebe Healthcare <br />New Beebe Surgical <br />Hospital* <br />Doctors Community <br />Medical Center <br />Surgical Department <br />Renovations* <br />UNC REX Healthcare <br />Heart and Vascular <br />Equipment Fit Out <br />*Completed with prior firm <br />EDUCATION <br />• BS, Electrical <br />Engineering, University <br />of Maryland, College <br />Park <br />PROFESSIONAL <br />REGISTRATION <br />• Professional Engineer: <br />MD #29246 <br />• LEED Accredited <br />Professional <br />• Healthcare Facility <br />Design Professional <br />DocuSign Envelope ID: 1920B089-58AA-4E97-8225-7BCF8DEBAAD4
The URL can be used to link to this page
Your browser does not support the video tag.