Browse
Search
Agenda - 04-16-2002 - 9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 04-16-2002
>
Agenda - 04-16-2002 - 9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 4:35:13 PM
Creation date
8/29/2008 10:37:59 AM
Metadata
Fields
Template:
BOCC
Date
4/16/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 20020416
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> RECOMMENDATION(S): The Manager recommends that the Board: <br /> 1. Approve the establishment of three new full-time permanent positions to support the <br /> Regulated Recyclable Materials Ordinance and associated operations as follows: <br /> • Solid Waste.Materials Transfer Operator at Grade 63 <br /> • Landfill Inspector at Grade 63 <br /> • Administrative Assistant II at Grade 62 <br /> 2. Amend the Orange County Classification and Pay Plan to add the new class of Solid <br /> Waste Materials Transfer Operator at Salary Grade 63. <br /> 3. Award bids for equipment as follows, and authorize the Purchasing Director to execute <br /> the appropriate paperwork: <br /> • Horizontal Grinder- Pioneer Machinery LLC of Sanford, North Carolina in the amount <br /> of$501,382.76 <br /> • Trommel Screen - Screening & Shredding Systems of Winston Salem, North Carolina <br /> at a delivered cost of$132,210.00 <br /> • Live Floor Trailer- Canam Steel Corporation of Points of Rock, Maryland at a <br /> delivered cost of$46,872.00 <br /> • Road Tractor-Triad Freightliner of Greensboro, North Carolina at a delivered cost of <br /> $79,669.00 <br /> • Crawler Loader- Gregory Poole of Raleigh, North Carolina at a delivered cost of <br /> $204,803.00 <br /> 4. Authorize the Finance Director to negotiate equipment financing arrangements with a <br /> local financial institution based on terms of 3.75% interest and a 59 month payback <br /> period, and to execute all necessary financing documents. <br /> With approval of the proposed positions and equipment, the date by which the RRMO could <br /> be effectively implemented would be July 2002. If the Board needs more time to deliberate <br /> about one or more pieces of equipment or positions, decisions could be taken up at the next <br /> BOCC meeting without jeopardizing any of the bids received. However, the effective date of <br /> RRMO implementation would be delayed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.