Browse
Search
Agenda - 12-13-2022; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 12-13-2022 Business Meeting
>
Agenda - 12-13-2022; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2022 2:54:35 PM
Creation date
12/8/2022 2:11:38 PM
Metadata
Fields
Template:
BOCC
Date
12/13/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda - 12-13-2022; Agenda for December 13, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 12-13-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> 1 request to add additional funding for the North-South Bus Rapid Transit (N-S BRT) project. The <br /> 2 PSC recommended using a portion of accumulated End of Year Fund Balance to add $15M, over <br /> 3 20-years, beginning in FY 2027 and to reflect the additional funding in the Transit Plan Update. <br /> 4 Attachment 2 is a revised financial summary that incorporates the additional funding through FY <br /> 5 2040. <br /> 6 <br /> 7 Orange County Transit Plan Staff Working Group (SWG) Recommendation: At its October 19, <br /> 8 2022 meeting, the SWG unanimously recommended adoption of the draft 2022 Transit Plan <br /> 9 Update by all parties and to include the additional funding for N-S BRT, consistent with the <br /> 10 recommendation provided by the PSC. <br /> 11 <br /> 12 OUTBoard Recommendation: At its October 19, 2022 meeting, the OUTBoard unanimously <br /> 13 recommended BOCC adoption of the draft 2022 Transit Plan Update to include the additional <br /> 14 funding for N-S BRT, consistent with the recommendation provided by the PSC. <br /> 15 <br /> 16 Adoption Process and Next Steps: <br /> 17 Orange County: <br /> 18 • PSC recommendations (5/20/22 & 10/14/22, Complete) <br /> 19 • SWG recommendation (10/19/22, Complete) <br /> 20 • OUTBoard Recommendation (10/19/22, Complete) <br /> 21 • BOCC Public Hearing and possible action (11/1/22) <br /> 22 • BOCC agenda item, if needed for action (11/15/22) <br /> 23 <br /> 24 DCHC MPO: <br /> 25 • Technical Committee recommendation to release draft for public comment (9/28/22) <br /> 26 (Complete) <br /> 27 • Board consideration to release draft for public comment (10/12/22) <br /> 28 (Complete) <br /> 29 • Technical Committee recommendation (11/16/22) <br /> 30 • Board adoption consideration (12/14/22) <br /> 31 <br /> 32 GoTriangle: <br /> 33 • Planning and Land Use Committee recommendation (TBD) <br /> 34 . Board adoption consideration (TBD) <br /> 35 <br /> 36 Tom Altieri, Comprehensive Planning Supervisor, introduced members of staff in the <br /> 37 audience and Scudder Wag with Jarrett Walker + Associates. He said that Scudder Wag was a <br /> 38 member of the renaissance team that helped develop the plan. <br /> 39 Scudder Wag said that it has been a pleasure to work with Orange County staff to help <br /> 40 the Board chart a new path forward for their new transit plan. He said that this is an excellent plan <br /> 41 for the Board to invest in. <br /> 42 Tom Altieri gave the following PowerPoint presentation: <br /> 43 <br /> 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.