Browse
Search
12.7.22 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
12.7.22 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:57:35 PM
Creation date
11/30/2022 4:54:32 PM
Metadata
Fields
Template:
BOCC
Date
12/7/2022
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49 <br /> ■ Although charter school students are not accounted for through the SAPFO <br /> process, they are monitored by the Department of Public Institution (DPI) which <br /> provides pupil information to the County for funding purposes. <br /> ■ Charter school enrollment is informally reported in the SAPFO Report's executive <br /> summary. <br /> 4. Portable Classrooms <br /> ■ SAPFO projection numbers relating to capacity do not include portable <br /> classrooms. If student membership temporarily exceeds 100% capacity, portable <br /> classrooms may be used to alleviate the overcapacity. If projections show that <br /> student membership is expected to exceed the adopted levels of service (105% <br /> at elementary school level, 107% at middle school level, and 110% at high <br /> school level) for an extended period of time, a new school servicing the affected <br /> level(s) would need to be added to the CIP (Capital Improvement Program) in <br /> order to be constructed in time to alleviate the projected overcapacity. <br /> ■ The SAPFO Memorandum of Understanding (MOU) excludes mobile classrooms <br /> as permanent, but they may be used to house temporary individual school <br /> overcapacity situations. The SAPFOTAC Annual Report and projections includes <br /> student membership numbers from portable classrooms, but not capacity <br /> numbers of the portable classrooms. Therefore, SAPFO projections may show a <br /> need for permanent classrooms earlier and the need for new schools is not <br /> `masked' by the use of portable classrooms. If portable classroom capacities <br /> were reported and included in the SAPFO projections, service levels may <br /> decrease and push the need for permanent classrooms out further in the future. <br /> The MOUs specifically state that only permanent buildings can be used to <br /> calculate capacity and specifically exclude using mobile or temporary classroom <br /> spaces as counting toward building capacity. <br /> 5. Pre-K Students <br /> ■ Although not included in SAPFO school capacity or membership numbers, Pre-K <br /> programs continue to impact operations at District elementary schools where <br /> Pre-K programs exist. <br /> ■ Both school districts struggle with locating and providing adequate space for Pre- <br /> K programs. Newer schools are designed and constructed with Pre-K <br /> classrooms; however, older schools are not forcing the school districts to absorb <br /> Pre-K students into existing elementary schools. This decreases overall available <br /> capacity for elementary school students. In some cases, portable classrooms <br /> have been set up to accommodate Pre-K students at schools that do not have <br /> the capacity in the existing school facility. <br /> ■ Pre-K students are informally reported in the SAPFO Report's executive <br /> summary. <br /> 6. School Renovation and Redevelopment (Capacity Changes) <br /> ■ The SAPFO system can identify new `whole' school needs, but can also <br /> accommodate partial capacity addition as in new school wings or planned <br /> capacity expansions such as the prototype high school designs with a core for <br /> 1,500 students, but an interim capacity of 1,000 students. <br /> ■ As renovations occur that may add capacity, this information will be added to the <br /> SAPFO program both in CAPS and CIP needs/student projections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.