Browse
Search
2022-613-E-AMS-Warren-Hay Mechanical Contractors-Hillsborough Commons remove unit heater assoicated gas lines paint gas lines
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-613-E-AMS-Warren-Hay Mechanical Contractors-Hillsborough Commons remove unit heater assoicated gas lines paint gas lines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 1:10:58 PM
Creation date
11/29/2022 1:08:55 PM
Metadata
Fields
Template:
Contract
Date
11/28/2022
Contract Starting Date
11/28/2022
Contract Ending Date
11/29/2022
Contract Document Type
Contract
Amount
$15,400.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WARREN - HAY <br />Mechanical Contractors <br />P.O. Box 818 • Hillsborough, NC 27278 <br />(919-732-4362) office (919-732-8660) Facsimile <br />www.warren-hay.com State License #7211 <br /> <br />November 17, 2022 <br /> <br /> <br />Orange County Public Works <br /> <br />Re: Mayo Street Hillsborough <br /> <br />PROPOSAL <br /> <br /> We hereby submit specifications and estimates for: As noted: <br /> <br />• Remove (2) electrical conduits (locations) terminating existing wire below roof <br />line allowing roofer to remove seal pitch pocket. <br />• Remove (1) gas unit heater, vent piping & gas piping being fed from roof <br />allowing roofer to remove / seal pitch pocket. <br />• Paint all gas piping on roof yellow. <br />• Provide & install blocks for anchoring drain line. <br /> <br />We propose hereby to furnish material and labor: $15,400.00 <br />Payment to be made as job progresses. <br /> <br /> <br />Acceptance: _______________________ <br /> <br />Date: _________________________________ <br /> <br />Exclusions / Clarifications: <br /> <br />• After hour, overtime premium labor. <br />• All roof work by others i.e. removal of pitch pockets once emptied, patching etc. <br /> <br /> <br /> <br /> <br />Respectfully submitted by: Ron LaPann Commercial Division ron.lapann@warren-hay.com Quote valid for 10 days. <br />DocuSign Envelope ID: 90C521F9-F6B3-46C8-9668-D63239619E49
The URL can be used to link to this page
Your browser does not support the video tag.