Browse
Search
2022-613-E-AMS-Warren-Hay Mechanical Contractors-Hillsborough Commons remove unit heater assoicated gas lines paint gas lines
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-613-E-AMS-Warren-Hay Mechanical Contractors-Hillsborough Commons remove unit heater assoicated gas lines paint gas lines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 1:10:58 PM
Creation date
11/29/2022 1:08:55 PM
Metadata
Fields
Template:
Contract
Date
11/28/2022
Contract Starting Date
11/28/2022
Contract Ending Date
11/29/2022
Contract Document Type
Contract
Amount
$15,400.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 06/21 <br /> <br />1 <br /> [Departmental Use Only] <br /> TITLE HCOB Unit Heater/Gas Lines <br /> FY 2022-2023 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 5th day <br />of December, 2022, by and between Warren-Hay Mechanical Contractors Inc., (hereinafter called the <br />“Contractor”), and Orange County, a political subdivision of the State of North Carolina, (hereinafter <br />called the “County,” “Orange County,” or “Owner”). <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br /> <br />a. This Agreement. <br /> <br />b. Designer Approved Bulletins and Field Orders. <br /> <br />c. Request for Proposals and addenda thereto. <br /> <br />d. Proposal. <br /> <br /> <br />2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by N/A (Sheet dated ) <br /> <br />b. Written specifications prepared by the project engineer. <br /> <br />c. Warren-Hay Mechanical Contractors Inc. proposal dated August 12, 2022 which fully <br />describes the work to be performed. Such work will hereafter be called the “Work”. <br /> <br />d. Related documents listed under Section 1 above. <br /> <br /> <br />3. TERM AND SCHEDULING <br />DocuSign Envelope ID: 90C521F9-F6B3-46C8-9668-D63239619E49
The URL can be used to link to this page
Your browser does not support the video tag.