Orange County NC Website
From:Alan Dorman <br />To:AMservice <br />Subject:FW: WCOB 3rd Floor Upfit - CO#2 <br />Date:Wednesday, September 21, 2022 5:58:48 AM <br />Attachments:CO #2 - HHA Signed.pdf <br />Kate, <br />Please route this contract. <br /> <br />Thanks, <br />Alan <br />Mobile: 919-619-8859 <br /> <br />From: Leah Filomena <LFilomena@hh-arch.com> <br />Sent: Tuesday, September 20, 2022 4:49 PM <br />To: Alan Dorman <adorman@orangecountync.gov>; Allison Cooper <br /><acooper@orangecountync.gov> <br />Cc: Dave Carey <dcarey@hh-arch.com>; Nicholas Zastrow <nzastrow@hh-arch.com>; Jeff Thompson <br /><JeffThompson@brawley.net>; Amanda Brooks <abrooks@brawley.net>; Steven Arndt <br /><sarndt@orangecountync.gov> <br />Subject: [EXTERNAL MAIL!] WCOB 3rd Floor Upfit - CO#2 <br /> <br />Alan and Allison, <br /> <br />Please find the attached CO for the 3rd floor renovation which incorporates the following PCOs: <br />PCO#2 - Additional ACT system replacement due to unforeseen conditions. Stud cavity repair <br />to accept new walls. $3040.02 <br />PCO#3 - Drywall finishing point-up in existing offices prior to <br />painting. $1413.72 <br />PCO#4 - Material Credit for substitution of electrified strikes and related hardware to match <br />existing conditions. ($841.74) <br /> <br />The total additional cost is $3612.00 which I believe will require a PO before it can be added to the <br />next payapp. <br /> <br />Best, <br /> <br />|||||||||||||||||||||||||||||| <br /> <br /> <br />Leah Filomena <br />Interior Designer, Project Captain <br />lfilomena@hh-arch.com <br /> <br />HH ARCHITECTURE <br />www.hh-arch.com <br /> <br />Main: 919 828-2301 | Direct: 984 272-4074 <br />1100 Dresser Court, Raleigh, NC 27609 <br /> <br />DocuSign Envelope ID: 1798465A-4756-4942-A886-77C465B1D31B