Browse
Search
2022-612-E-AMS-WB Brawley Company-WCOB 3rd floor renovations aditional upgrades needed
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-612-E-AMS-WB Brawley Company-WCOB 3rd floor renovations aditional upgrades needed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 3:25:52 PM
Creation date
11/22/2022 3:25:02 PM
Metadata
Fields
Template:
Contract
Date
11/2/2022
Contract Starting Date
11/2/2022
Contract Ending Date
11/17/2022
Contract Document Type
Contract
Amount
$3,612.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order 352951 -Orange County West Campus Office <br />3rd Floor Upfit <br />Contemplated Change Order #1 <br />Secure rooms changed to storeroom lock with electric strike <br />Aug 25,2022 2:02 PM Page 1 of 1 <br />-1 Single Door #327 CORRIDOR 324 to SECURE 327 90°LH <br />1 Single Door #327 CORRIDOR 324 to SECURE 327 90°LH <br />1 Hinges 5BB1 4 1/2 x 4 1/2 652 IV <br />-1 Hinges 5BB1 4 1/2 x 4 1/2 TW8 652 IV <br />-1 Electrified Lockset ML20906 LWA L4 M92 SEC LH 630 CR <br />1 Lock Set CL3157 NZD 626 CR <br />1 Electric Strike Body 8000-LBM 630 HS <br />-1 Single Door #338A CORRIDOR 336 to HR SECURE 338 110°LH <br />1 Single Door #338A CORRIDOR 336 to HR SECURE 338 110°LH <br />1 Hinges 5BB1 4 1/2 x 4 1/2 652 IV <br />-1 Hinges 5BB1 4 1/2 x 4 1/2 TW8 652 IV <br />-1 Electrified Lockset ML20906 LWA L4 M92 SEC LH 630 CR <br />1 Lock Set CL3157 NZD 626 CR <br />1 Electric Strike Body 8000-LBM 630 HS <br />-1 Single Door #338B WORK 346 to HR SECURE 338 110°LH <br />1 Single Door #338B WORK 346 to HR SECURE 338 110°LH <br />1 Hinges 5BB1 4 1/2 x 4 1/2 652 IV <br />-1 Hinges 5BB1 4 1/2 x 4 1/2 TW8 652 IV <br />-1 Electrified Lockset ML20906 LWA L4 M92 SEC LH 630 CR <br />1 Lock Set CL3157 NZD 626 CR <br />1 Electric Strike Body 8000-LBM 630 HS <br />Section Totals <br />08 71 11 Finish Hardware (816.12) <br />Pre-Tax Total:(816.12) <br />Taxes <br />10202 NC-NORTH CAROLINA STATE TAX 4.75%19.11 <br />11199 NC-Orange Co (+Transit)9.06 <br />11395 NC-Orange Co Transit .5 (eff 4/1/13)2.01 <br />Tax Total:30.18 <br />Grand Total:(785.94) <br />Credit for field work to be determined when scope <br />finalization <br />Deduct for Mortise lock prep per door = $50.00 <br />Deduct for raceway prep per door = $75.00 <br />Pick up and delivery charges also negated due to existing <br />material reuse without shop work. <br />DocuSign Envelope ID: 1798465A-4756-4942-A886-77C465B1D31B
The URL can be used to link to this page
Your browser does not support the video tag.