Browse
Search
2022-612-E-AMS-WB Brawley Company-WCOB 3rd floor renovations aditional upgrades needed
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-612-E-AMS-WB Brawley Company-WCOB 3rd floor renovations aditional upgrades needed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 3:25:52 PM
Creation date
11/22/2022 3:25:02 PM
Metadata
Fields
Template:
Contract
Date
11/2/2022
Contract Starting Date
11/2/2022
Contract Ending Date
11/17/2022
Contract Document Type
Contract
Amount
$3,612.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To:Date:8/26/2022 <br />Project:PCCO #: <br />Project ID#:HH Project #: <br />Contractor:Contractor #: <br />Description of change: <br />GC Materials (Attach list with Qty, Item, Unit $, Unit mh, total mh, OT mh, Total $)SUBTOTALS <br />1. Total Direct Cost of Materials 0 $0.00 <br />2. Sales Tax (NC, Wake County) 7.25% 0 $0.00 <br />3. Shipping, Transportation, Fees $0.00 <br />4. Total for Materials & Shipping $0.00 <br />5. Overhead and Profit on Item 4 10%$0.00 <br />(10% maximum)$0.00 <br />GC Labor:(Attach list(s) with Labor Scope(s), Labor Rate(s), Labor Hour(s) <br />6. Total Labor:-$ <br />7. Total Supervison:-$ <br />8. Payroll Taxes & Insurance 40.0%$0.00 <br />9. Total Labor + Burden (6+7+8)$0.00 <br />10. Overhead and Profit on Item 9 10.0%$0.00 <br />(10% maximum on straight labor cost, not premium)$0.00 <br />Equipment Rental: (Attach quotes) <br />11. Equipment Rental (Includes 7.5% Sales Tax, Delivery Fees)$0.00 <br />12. Waste/Dump Fees $0.00 <br />13. Total for Equipment Rental $0.00 <br />14. Overhead and Profit 10.0%$0.00 <br />(10% maximum)$0.00 <br />Subcontractors: (Attach quotes with material and labor backup) <br />15. Subcontractors ($785.94) <br />16.Overhead and Profit on Item 15 5.0%($39.30) <br />(5% maximum)($825.24) <br />Subtotal Before Bonds and Insurance ($825.24) <br />GC Bonds and Insurance: <br />17.Insurance (1% of of direct cost subtotal)($8.25) <br />18.Bonds (1% of direct cost sustotal)($8.25)o)($16.50) <br />Total:($841.74) <br />Time Extension Request of:0 day(s) is being requested for this change in scope of work. <br />Notice to Proceed Date: 7/11/2022 <br />Original/Revised Contract Days to Complete:120 <br />Original/Revised Substantial Completion Date:11/8/2022 <br />Additional Contract Days to Complete: <br />Adjusted Contract Days to Complete: <br />Adjusted Substantial Completion Date: 11/8/2022 <br />Contractor's Signature: ___________________________________________________________Date: ________________ <br />Approval Recommended by Design Consultant: ___________________________________________________________Date: ________________ <br />Owner's Representative Approval: ___________________________________________________Date: ________________ <br />cc: <br />PRIME CONTRACT CHANGE ORDER PROPOSAL WORKSHEET <br />WB Brawley <br />The Contractor agrees to perform the work outlined in this change proposal for the amount specified above and in accordance <br />with the Contract documents if the work is authorized by the Owner. <br />RFI#5 substitution of electrified strikes and related hardware to match existing conditions. Material credit only; shop and field <br />labor credit to be issued as a component of a labor and material credit for re-purposing matching and existing doors, frames <br />and hardware already on site and in good condition. <br />21-094 <br />04 <br />2022108 <br />Leah Filomena, HH Architecture <br />West Campus 3rd Floor Office Upfit <br />DocuSign Envelope ID: 1798465A-4756-4942-A886-77C465B1D31B
The URL can be used to link to this page
Your browser does not support the video tag.