Orange County NC Website
10 <br /> Christopher Sandt said slide #9 showed the threshold chart, which developers and <br /> applicants have to adhere to this if they want to disturb earth in Orange County. He said the <br /> chart was not previously part of the LIDO, but it makes sense for it to be added for <br /> thoroughness of the document. <br /> Slide #10 <br /> RECOMMENDATIONS: <br /> 1. Receive the proposed UCO Amendments; <br /> 2. Conduct the Public Hearing and accept the Planning Board <br /> recommendation and staff/public comments; <br /> 3. Close the Public Hearing; and <br /> 4. ApproveMolpt the proposed UDO Amendments <br /> Christopher Sandt said they submit annual reports to the state for erosion control and <br /> storm water, which are due on October 21 st. He said over the past couple of years they have <br /> made it clear to the state that the county has been working on these amendments, and hopes <br /> to be able to report that the needed changes have been made with the adoption of the changes <br /> tonight. <br /> Slide #11 <br /> QUESTIONS/COMMENTS: <br /> Cy Stober.AICP (Planning Director),cstober0orangyecoun1ync.*o 919-245-2575 <br /> Chrlstopher Sandt,PE(Staff Englneer),csendt Oran ocounl nc. y,919-245-2683 <br /> Eno Fbw <br /> Commissioner Bedford asked what a borrow area is. <br />