Browse
Search
Agenda - 11-15-2022; 8-i - Approval of the Assistance Policy and the Procurement and Disbursement Policy for the 2022 North Carolina Housing Finance Agency (NCHFA) Urgent Repair Program (URP22)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 11-15-2022 Business Meeting
>
Agenda - 11-15-2022; 8-i - Approval of the Assistance Policy and the Procurement and Disbursement Policy for the 2022 North Carolina Housing Finance Agency (NCHFA) Urgent Repair Program (URP22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:52:29 PM
Creation date
11/10/2022 2:48:05 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-i
Document Relationships
Agenda for November 15, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 11-15-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> GRANGE COUNT' <br /> HOUSING DEPARTMENT <br /> more than fourteen (14) units, applications will continue to be accepted on a rolling basis until all <br /> funds are committed.Applicants not receiving notification by November 30, 2022 that they were <br /> chosen may contact Jack Watson at (919) 558-9394 to confirm the disposition of the application. <br /> 4. Applicant interviews:Approved applicants will be provided detailed information on assistance, <br /> program repair/modification standards and the contracting procedures associated with their <br /> project at this informational interview. <br /> 5. Work write-up:The County's Rehabilitation Specialist will visit the home again for a more <br /> thorough inspection. All parts of the home must be made accessible for inspection, including the <br /> attic and crawlspace, if any.The owner should report any known problems such as electrical short <br /> circuits, blinking lights, roof leaks and the like.The Rehabilitation Specialist will prepare complete <br /> and detailed work specifications (known as the "work write-up"). A final cost estimate will also be <br /> prepared by the Rehabilitation Specialist and held in confidence until bidding is completed. <br /> 6. Formal agreement:After approval of the work write-up, the homeowner will sign a formal <br /> agreement that will explain and govern the repair/modification process and an explanation of the <br /> Promissory Note, which is considered a forgivable loan.This agreement will define the roles of the <br /> parties involved throughout the process. <br /> 7. Contractor selection:To the maximum extent practical, a minimum of three (3) eligible <br /> contractors on the Contractor Registry should be invited to bid on each job and the lowest, most <br /> responsive and responsible bidder shall be selected for the contract. "Responsive and responsible" <br /> means the following: the contractor is deemed able to complete the work in a timely fashion; the <br /> bid is within 15% in either direction of the County's cost estimate;the contractor has not been <br /> suspended or debarred; and there is no real or perceived conflict of interest. Because of the <br /> increasing difficulty of soliciting eligible bids for URP projects,the County can solicit a bid from an <br /> eligible contractor on the Contractor Registry based on their rotating placement on the Registry. If <br /> the selected contractor submits a responsive and responsible bid then it will be accepted and after <br /> successful completion of the project that contractor's name will rotate to the end of the Registry. <br /> If the contractor does not submit a responsive and responsible bid or chooses not to submit a bid, <br /> then the next contractor on the Registry will be eligible to submit a bid on the project. In addition, <br /> in emergency situations,telephone or email bids or quotes will be accepted and documentation of <br /> such bids or quotes will be maintained in the applicable file. <br /> 8. Execution of loan and contract:The loan will be executed as well as the repair/modification <br /> contract prior to work beginning on the project.This contract will be between the contractor and <br /> homeowner,with the County signing as an interested third party.The cost of the actual work and <br /> project related support costs up to the maximum amount of$12,000 will be included in the loan <br /> document. <br /> 9. Pre-construction conference:A pre-construction meeting will be held at the home.At this time, <br /> the homeowner, contractor and program representatives will be present and discuss the details of <br /> the work to be done. Starting and ending dates will be agreed upon, along with any special <br /> arrangements such as weekend or evening work hours and disposition of items to be removed <br /> from the home (such as old plumbing, etc.). If the contract has been executed, the County will <br /> Orange County 2022 Urgent Repair Program Assistance Policy Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.