Orange County NC Website
10 <br /> 1 Christopher Sandt said slide #9 showed the threshold chart, which developers and <br /> 2 applicants have to adhere to this if they want to disturb earth in Orange County. He said the <br /> 3 chart was not previously part of the UDO, but it makes sense for it to be added for thoroughness <br /> 4 of the document. <br /> 5 <br /> 6 Slide #10 <br /> RECOMMENDATIONS: <br /> 1. Receive the proposed UDO Amendments; <br /> 2. Conduct the Public Hearing and accept the Planning Board <br /> recommendation and stafffpublic comments: <br /> 3. Close the Public Hearing; and <br /> 4. Approve{Adopt the proposed UDt]Amendments <br /> 7 <br /> 8 Christopher Sandt said they submit annual reports to the state for erosion control and <br /> 9 storm water, which are due on October 21St. He said over the past couple of years they have <br /> 10 made it clear to the state that the county has been working on these amendments, and hopes to <br /> 11 be able to report that the needed changes have been made with the adoption of the changes <br /> 12 tonight. <br /> 13 <br /> 14 Slide #11 <br /> QUESTIONS/COMMENTS: <br /> Cy Stober,AICP (Planning Director),c.5toberaorangecountync.nov,919-245-2575 <br /> GhrlstopherSandt,PE(Staff Englneer),csandtDoranraecountync.00v,919-245-2583 <br /> a <br /> 15 <br /> 16 Commissioner Bedford asked what a borrow area is. <br />