Browse
Search
2022-588-E-AMS-Siemens Industry-West Campus office building replace starters per proposal
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-588-E-AMS-Siemens Industry-West Campus office building replace starters per proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:54:30 PM
Creation date
11/9/2022 2:53:34 PM
Metadata
Fields
Template:
Contract
Date
11/9/2022
Contract Starting Date
11/9/2022
Contract Ending Date
11/9/2022
Contract Document Type
Contract
Amount
$9,126.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:352138017-1`115-48D8-A28D-710EODC69AO9 <br /> SIEMENS <br /> Scope of Work <br /> Replacement of 2 VFDs with 2 Starters in West Campus Office Building includes: <br /> 1. Demo (2)VFDs that server the HW and SCHW Pumps in Basement M-008 Pump Room <br /> 2. Provide and install (2) new combination starters and disconnects for these pumps <br /> 3. Wire the new starters to the existing pumps and existing PXCM controller located in a local <br /> control room. <br /> 4. Provide any programming and graphics modification at the DesigoCC system. <br /> 5. Test and verify functionality of pumps with new starters <br /> 6. One year warranty on parts and labor <br /> Exclusions&Clarifications <br /> 1. Any material not specified above. <br /> 2. Applicable sales taxes as required by law.Sales tax will be billed at the time of invoicing. <br /> 3. All work conducted during normal working hours, IM-F Sam to 5pm. <br /> 4. Due to COVID-19 impacts,this work is subject to potential labor and material delays which are <br /> out of our control. <br /> 5. Pricing subject to change after 30 days. <br /> Terms and Conditions (Click to download) <br /> Terms & Conditions <br /> As a result of the global Covid-19 Virus outbreak,temporary delays in delivery, labor or services from <br /> Siemens and its sub-suppliers or subcontractors may occur.Among other factors,Siemens' delivery is subject <br /> to the correct and punctual supply from sub-suppliers or subcontractors, and Siemens reserves the right to <br /> make partial deliveries or modify its labor or services.While Siemens shall make every commercially <br /> reasonable effort to meet the delivery or service or completion date mentioned above, such date is subject <br /> to change. <br /> Siemens Industry, Inc. <br /> 215 Southport Dr, Suite 900 <br /> Morrisville, NC 27560 <br /> 919-469-5095 <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.