Browse
Search
2022-565-E-Solid Waste-Landmark Management Partners-Repair Bathroooms
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-565-E-Solid Waste-Landmark Management Partners-Repair Bathroooms
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2022 12:01:28 PM
Creation date
11/2/2022 12:01:16 PM
Metadata
Fields
Template:
Contract
Date
10/31/2022
Contract Starting Date
10/31/2022
Contract Ending Date
11/2/2022
Contract Document Type
Contract
Amount
$6,216.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />WORK ORDER PROPOSAL <br />1900 Borland Rd, Hillsborough, NC 27278 <br />phone: 919.337.8180 www.landmark.build DATE:10/14/2022 <br />TO:PROJECT NAME:Toilet Room Partition Replacement <br />ATTN:PROJECT NUMBER:22107 <br />Orange County Solid Waste <br />Bruce Woody <br />1207 Eubanks Rd <br />Chapel Hill, NC 27516 1514 Eubanks Rd, Chapel Hill, NC <br />27516 <br />Landmark Design Build offers the following proposed scope of work for the iden fied project <br />1 550 $550.00 <br /> -Remove exis ng par on stalls & dispose of properly. <br /> Provide materials, doors, a achment pieces for two <br />(2) toilet room stalls. Floor Mounted Overhead Braced, material will be HDPE <br />to closely match the exis ng color. <br />1 3601.25 $3,601.25 <br />. Note: these stalls will have a 9” <br />minimum toe clearance to meet ADA. <br />1 563.5 $563.50 <br /> Erect par ons, doors, and a achment pieces for two <br />(2) toilet room stalls. <br />2 345 $690.00 <br />PROJECT MANAGEMENT, CONTRACTOR FEE & STANDARD MARKUP (15%)$810.71 <br />This proposal is valid for 30 days. We look forward to working with you! <br />Sincerely, <br /> for Landmark Design Build <br />H. Nathan Robinson, ME, Partner/Managing Director <br />There are broken stall par ons in the restrooms of the Orange County Solid Waste office. A ached is a quote to <br />replace these par ons with all new ones. Unfortunately, none of the par on manufacturers we are aware of <br />manufacture the same style of pilaster that is currently damaged & on site/ damaged. This means we must replace <br />both the pilasters and the par ons. The replacement component par ons are made from solid plas c to match <br />the same color as what’s there currently. <br />PHYSICAL ADDRESS <br />WHERE WORK WILL <br />OCCUR: <br />Descrip on QTY Unit Cost Totals <br />TOTAL APPROVED PROJECT FEE:$6,215.46 <br />Scope Defini on <br />1)Demo Exis ng Par ons <br />2a)Furnish new par ons. <br />2b)Addi onal length privacy par ons <br />3)Install new par ons. <br />The signature below authorizes Landmark Management Partners to proceed. Full payment for the scope of work in this <br />proposal shall be made at the conclusion of work. This proposal accepted by is approved by the authorized person listed <br />below: <br />TOTAL APPROVED PROJECT FEE:$6,215.46 <br />(Authorized Owner Representative Signature)(Date) <br />(Printed Name) <br />DocuSign Envelope ID: 71C7FB2E-C138-4712-83E1-D8442F595151
The URL can be used to link to this page
Your browser does not support the video tag.