Orange County NC Website
1 00 executive summary. <br /> PLAN TIMELINE <br /> Analysis & Conceptual Pfoposed FlFinol TronO <br /> Network ' Transit Draft Transit Plon <br /> Development Scenarios <br /> 'A Plan <br /> u— ,P7 Adoption <br /> Analysis& . • <br /> lic 17 <br /> Network PSC <br /> Development e�� <br /> Spring 2020 Summer 2020 Fall 2020 Winter 2021 Summer 2021 Fall 2021 Spring 2022 Fall 2022 <br /> PLAN PARTNERS <br /> The Plan Update was led by Orange County staff and a consultant team was hired <br /> to develop the plan. A Policy Steering Committee (PSC) of local elected officials was <br /> convened to guide the plan's policy direction. Municipalities (Carrboro, Chapel Hill, <br /> Hillsborough, and Mebane), the University of North Carolina at Chapel Hill, transit service <br /> providers (Chapel Hill Transit, Orange County Public Transportation, and GoTriangle), and <br /> the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO) were <br /> also closely involved in the plan's development. <br /> �S501?0 <br /> G <br /> R \\\II <br /> ORANGE ` <br /> COUNTY <br /> 1.7 �rJ V,4THE UNIVERSITY <br /> NORTH CAROLINA fI CAR Ty CARP of NORTH CAROLINA <br /> iv at CHAPEL HILL <br /> DURHAM CHAPEL CARRHCRC <br /> ri OrangleCounty D C H C IJ�J'JI GO!* <br /> PUBLIC TRANSIT METROPOLITAN PLANNING ORGANIZATION � Triangle <br />