Browse
Search
Agenda - 11-01-2022; 12-6 - Information Item - Memorandum - Request for Qualifications-Consultant for School Facilities Assessment and Optimization
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 11-01-2022 Business Meeting
>
Agenda - 11-01-2022; 12-6 - Information Item - Memorandum - Request for Qualifications-Consultant for School Facilities Assessment and Optimization
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 3:01:50 PM
Creation date
10/27/2022 3:07:16 PM
Metadata
Fields
Template:
BOCC
Date
11/1/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
12-6
Document Relationships
Agenda for November 1, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 11-01-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
44 <br /> PA TH WA YS ELEMENTARY SCHOOL School Capacity' <br /> Major Capital Projects Requiring Additional Funding SAPFO CAPACITY;: <br /> MEMBERSHIP COUNT. 381 <br /> AGE OF SCHOOUBUILDINGS 2000 <br /> PROJECT PRIORITY&CATEGORY ESTIMATED RANGE OF COST. CAPACITY <br /> IMPACT 2 <br /> Option :SAFETY LOW HIGH <br /> I IMPLEMENT SECURITY RECOMMENDATIONS $100,000 $140,000 N <br /> Subtotal $100,000 $140,000 0 <br /> Option NEW CONSTRUCTION&BUILDING ADDITIONS LOW HIGH <br /> Subtotal $0 $0 0 <br /> MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH<10 <br /> Option . LOW HIGH <br /> .YEARS OF USABLE LIFE <br /> 1 NEW BOILER $242,396 $302,994 N <br /> 1 NEW CHILLER $605,989 $757,486 N <br /> I :MECHANICAL HVAC EQUIPMENT $714,309 $1,054,421 N <br /> 1 ::ENERGY MANAGEMENT SYSTEM UPGRADE $323,000 $452,200 N <br /> a <br /> Subtotal 1 $1,885,694 $2,567,101 0 <br /> Option MAJOR BUILDING IMPROVEMENTS LOW HIGH <br /> 1 ;FOOD SERVICE RENOVATIONS $7,120 $10,605 N <br /> I PARKING LOT EXPANSION $252,000 $310,000 N <br /> I NEW EMERGENCY GENERATOR LIGHTING $193,800 $323,000 N <br /> Subtotal <br /> $452,920 $643,604 0 <br /> Grand Total(2024 Costs w/increased capacity). $2,438,614 $3,350,705 0 <br /> Number of mobile units currently on site 0 <br /> Note:The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities <br /> Assessment as well as projects that have been identified since that study.None of the projects listed have been fully funded. <br /> 1 School Capacity:Orange County NG Schools Adequate Public t-acilities Ordinance nnual membership count November 15,2019.LeveFo-T-- <br /> Service(LOS)means the amount(level)of students that can be accommodated(serviced)at certain school system grade group.[i.e.,Elementary level <br /> (K-5),Middle Level(6-8),High School Level(9-12)]Standards for LOS:Elementary 105%,Middle 107%,High School 110%.Source:Orange County NC <br /> SAPFO Annual Report. Class size reduction phase-in based on House Bill 90(SL 2017).Allotment and average class size in grades K-3 shall be at the <br /> 12Capacity Impact:YIN(number indicates number of potential seats gained or lost.) <br /> Priority Ranking Key <br /> ----R-e—pair,replacement or renovation of items,components or systems that are important to the health and safety of esutudents an <br /> staffand to sustain the overall operation of the facility.General maintaince and system service life upgrades.(state building code <br /> violations,health department violations,handicapped accessibility issues,removal of hazardous material,security issues not <br /> Option I I being met by current systems) <br /> Option 2 Repair and renovation of long-range items that also bring the class sizes uare footage of elementary classrooms to 1,200 sf <br /> Option J Repair and long-range improvements that extend a minimum of twenty-five years of additional operation to a facility and meet <br /> REVISED DATE:1/812022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.