Orange County NC Website
ORANGE MIDDLE SCHOOL School Capacity' 42 <br /> Major capital Projects Requiring Additional Funding SAPFO CAPACITY;: 726 <br /> MEMBERSHIP COUNT" 642 <br /> AGE OF SCHOOL/BUILDINGS 1968 <br /> PROJECT PRIORITY&CATEGORY ESTIMATED RANGE OF COST. CAPACITY <br /> IMPACT 2 <br /> Option SAFETY LOW HIGH <br /> I IMPLEMENT SECURITY RECOMMENDATIONS $162,102 $184,827 N <br /> Subtotal <br /> $162,102 $184,827 0 <br /> Option NEW CONSTRUCTION&BUILDING ADDITIONS LOW HIGH <br /> Subtotal $0 $0 0 <br /> MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH<10 Option LOW HIGH <br /> .YEARS OF USABLE LIFE a <br /> 1 NEW BOILER $242,396 $302,994 N <br /> a <br /> a <br /> a <br /> I :;NEW CHILLER $393,893 $454,492 :: N <br /> a a <br /> a a <br /> 1 :REPLACE ALL AIR HANDLERS $1,060,481 $1,151,379 N <br /> a <br /> Subtotal $1,696,769 i $1,908,865 0 <br /> Option MAJOR BUILDING IMPROVEMENTS LOW HIGH <br /> I REPLACE CANOPIES CAMPUS-WIDE <br /> $1,724,039 $1,896,745 N <br /> 1 ::FOOD SERVICE RENOVATIONS $268,908 $309,736 N <br /> ::INTERIOR RENOVATIONS: UPGRADE SCIENCE CLASSROOMS TO <br /> $325,719 $356,019 N <br /> :DPI STANDARDS <br /> 1 :LIGHTING: ENERGY EFFICIENT LIGHTING UPGRADE $655,066 $859,542 N <br /> NEW EMERGENCY GENERATOR LIGHTING $270,354 $450,318 N <br /> Subtotal $3,244,086 $3,872,360 0 <br /> Grand Total(2024 Costs w/increased capacity). $5,102,957 $5,966,052 <br /> 0 <br /> Number of mobile units currently on site 0 <br /> Note: The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities <br /> Assessment as well as projects that have been identified since that study.None of the projects listed have been fully funded. <br /> I Owluul udlidully.Uldflyu LUUIIIY IV,-owluuls/wequalu r-uollu rawilues Litumance(omrru).mimuni muninumvp munt movenloer 10,ZUI&.LeVeIZT— <br /> Service(LOS)means the amount(level)of students that can be accommodated(serviced)at certain school system grade group.[i.e.,Elementary level <br /> (K-5),Middle Level(6-8),High School Level(9-12)]Standards for LOS:Elementary 105%,Middle 107%,High School 110%.Source:Orange County NC <br /> SAPFO Annual Report. Class size reduction phase-in based on House Bill 90(SL 2017).Allotment and average class size in grades K-3 shall be at the <br /> Ifollowing ratios for 2021-2022:Kindergarten(1:18), 1st Grade(1:16),2nd&3rd Grade(1:17). <br /> 12Gapacity Impact:YIN(number indicates number of potential seats gained or lost.) <br /> Priority Ranking Key <br /> R-e—pair,replacement or renovation of items,components or systems that are important to the health and safety of esutudents an <br /> staffand to sustain the overall operation of the facility.General maintaince and system service life upgrades.(state building code <br /> violations,health department violations,handicapped accessibility issues,removal of hazardous material,security issues not <br /> Option I being met by current systems) <br /> air and renovation of long-range items that also bring the class sizes footage of elementary classrooms to 1,200 sf <br /> PTI_on_ Rep <br /> 2�_ —1 <br /> upriond Repair and long-range improvements that extend a minimum of twenty-five years of additional operation to a facility and meet <br /> REVISED DATE:1/8/2022 <br />