Orange County NC Website
41 <br /> ORANGE HIGH SCHOOL School Capacity' <br /> Major capital Projects Requiring Additional Funding SAPFO CAPACITY 1,3 <br /> MEMBERSHIP COUNT 1,2913 <br /> AGE OF SCHOOL/BUILDINGS 1962 <br /> PROJECT PRIORITY&CATEGORY ESTIMATED RANGE OF COST. CAPACITY <br /> IMPACT 2 <br /> Option SAFETY LOW HIGH <br /> I IMPLEMENT SECURITY RECOMMENDATIONS $524,180 <br /> $975,000 N <br /> a <br /> Subtotal $524,180 $975,000 0 <br /> a <br /> Option NEW CONSTRUCTION&BUILDING ADDITIONS LOW HIGH <br /> 3 REPLACE WORKFORCE DEVELOPMENT BUILDING $4,393,420 $5,491,775 TBD <br /> Subtotal $4,393,420 $5,491,775 TBD <br /> MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH<10 Option LOW HIGH <br /> .YEARS OF USABLE LIFE <br /> I ROOF REPLACEMENTS(400/AUX GYM) $350,000 $525,000 N <br /> 1 ::NEW BOILER-FIELD HOUSE <br /> $121,198 1 $151,497 N <br /> I ENERGY MANAGEMENT SYSTEM UPGRADE $1,132,112 1 $1,455,572 N <br /> 1 ELECTRICAL SYSTEMS UGRADE $1,375,595 $1,790,697 N <br /> Subtotal $2,978,904 $3,922,766 0 <br /> Option MAJOR BUILDING IMPROVEMENTS <br /> LOW HIGH <br /> 1 :FOOD SERVICE RENOVATIONS $266,938 $348,065 <br /> N <br /> 1 ::BACK DRIVEWAY REPAIR $1,363,475 $1,666,470 N <br /> I ::INTERIOR RENOVATIONS: NON-ACCESSIBLE GROUP RESTROOMS 1 $699,917 1 $769,606 N <br /> 1 :INTERIOR RENOVATIONS:WOOD GYM FLOORS REFURBISH $143,922 <br /> $159,072 N <br /> I 1IGHTING: ENERGY EFFICIENT LIGHTING UPGRADE $1,222,252 $1,584,344 N <br /> 1 ;NEW EMERGENCY GENERATOR LIGHTING $485,191 $808,651 <br /> N <br /> Subtotal $4,181,696 $5,336,208 1 0 <br /> Grand Total(2024 Costs w/increased capacity) $12,078,201 $15,725,749 TED <br /> Number of mobile units currently on site 8 <br /> Note: The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities <br /> Assessment as well as projects that have been identified since that study.None of the projects listed have been fully funded. <br /> I School Capacity:Orange County NC Schools Adequate Public Facilities Ordinance(SAPFO).Annual membership count November 15,2019.Level of <br /> Service(LOS)means the amount(/eve/)of students that can be accommodated(serviced)at certain school system grade group,[i.e.,Elementary/eve/ <br /> (K-5),Middle Level(6-8),High School Level(9-12)]Standards for LOS:Elementary 105%,Middle 107%,High School 110%.Source:Orange County NC <br /> SAPFO Annual Report. Class size reduction phase-in based on House Bill 90(SL 2017).Allotment and average class size in grades K-3 shall be at the <br /> ifollowing ratios for 2021-2022:Kindergarten(1:18),1st Grade(1:16),2nd&3rd Grade(1:17). <br /> 12capacity impact:YIN(number indicates number of potential seats gained or lost.) <br /> Priority Ranking Key <br /> staff and to sustain the overall operation of the facility.General maintaince and system service life upgrades.(state building code <br /> violations,health department violations,handicapped accessibility issues,removal of hazardous material,security issues not <br /> Option 1 being met by current systems) <br /> option 2 Repair and renovation of long-range items that also bring the class sizes uare footage of elementary classrooms to 1,200 sf <br /> Option 3 Repair and long-range improvements that extend a minimum of twenty-five years of additional operation to a facility and meet <br /> REVISED DATE:1/812022 <br />