Browse
Search
Agenda - 11-01-2022; 12-6 - Information Item - Memorandum - Request for Qualifications-Consultant for School Facilities Assessment and Optimization
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 11-01-2022 Business Meeting
>
Agenda - 11-01-2022; 12-6 - Information Item - Memorandum - Request for Qualifications-Consultant for School Facilities Assessment and Optimization
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 3:01:50 PM
Creation date
10/27/2022 3:07:16 PM
Metadata
Fields
Template:
BOCC
Date
11/1/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
12-6
Document Relationships
Agenda for November 1, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 11-01-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br /> NORTH CAROLINA <br /> produce an accurate analysis that identifies visible and discernable (through non-destructive <br /> means)components and elements requiring maintenance or other planned action.The Facility <br /> Condition Assessments are expected to serve as an important reference and decision-making <br /> resource for current and future capital planning and funding decisions. To that extent any <br /> recommended software to facilitate ongoing updates by both school districts is encouraged. <br /> 1) The facility conditions assessment will focus and consider the following property <br /> elements: <br /> a. Design <br /> b. Exterior Systems- roofs, walls, window systems, doors <br /> c. Emergency communications (telephones and intercom systems) <br /> d. Interior Construction-walls,doors,flooring,visible structural <br /> component <br /> e. Interior Finishes: Flooring, ceiling,wall finishes <br /> f. Health/Fire/Life Safety systems <br /> g. Security and Facility Safety Considerations <br /> h. Handicap Accessibility-ADA requirements <br /> i. Heating,Ventilation and Air Conditioning <br /> j. Plumbing <br /> k. Electrical and Service Distribution <br /> I. Fire Suppression <br /> m. Special Electrical Systems, Emergency Power,Telecommunications <br /> n. Technology Infrastructure <br /> o. Special Construction <br /> p. Vertical Transportation (Elevators, lifts, etc.) <br /> Additional elements shall include site utilities, fencing, athletic fields, playground <br /> equipment,vehicle circulation, parking, and other site surface structures. <br /> 2) Integration of the Districts Supplied Facility Condition Data <br /> In addition to observed facilities deficiency conditions, existing Districts supplied <br /> facility condition data shall be reviewed by the Consultant for incorporation into an <br /> industry relevant platform. All Districts-supplied facility condition data shall be <br /> identified as such.The Districts-supplied data may include any of the following: prior <br /> engineering studies, hazardous materials audits, air or water quality studies, or <br /> other related facility condition data. Inclusion of existing Districts supplied reports, <br /> electronic databases or spreadsheets, and other data will be considered on a case- <br /> by-case basis. <br /> 3) Corrections- Deficient Conditions <br /> For every deficient condition identified in the audit,a means of correcting the condition <br /> (a correction project) shall be developed by the Consultant. Each correction project <br /> shall entail a detailed description of the methods and quantities of labor and materials <br /> necessary to conduct the work. A detailed, multiple line item construction estimate <br /> shall also be developed by the Consultant. The estimates shall be based upon R.S. <br /> Means Construction and Facilities Maintenance and Repair Costs data and estimating <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.