Orange County NC Website
39 <br /> HILLSBOROUGH ELEMENTARY SCHOOL School Capacity' <br /> Major Capital Projects Requiring Additional Funding SAPFO CAPACITY;: <br /> MEMBERSHIP COUNT. 444 <br /> AGE OF SCHOOL/BUILDINGS 1952 <br /> PROJECT PRIORITY&CATEGORY ESTIMATED RANGE OF COST. CAPACITY <br /> IMPACT 2 <br /> Option SAFETY LOW HIGH <br /> I :IMPLEMENT SECURITY RECOMMENDATIONS $143,922 $186,948 N <br /> a Subtotal $143,922 i $186,948 0 <br /> a <br /> Option NEW CONSTRUCTION&BUILDING ADDITIONS LOW HIGH <br /> 2 REPLACE BUILDING 100 $22,500,000 $26,848,000 TBD <br /> Subtotal $22,500,000 $26,848,000 TBD <br /> MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH<10 <br /> Option . LOW HIGH <br /> .YEARS OF USABLE LIFE <br /> I ;NEW HVAC SYSTEM $1,735,837 $2,433,176 N <br /> :ENERGY MANAGEMENT SYSTEM UPGRADE $386,397 $496,796 N <br /> a <br /> 1 :ROOF REPLACEMENT(BLDG 200/300/1 OO/LC) $1,800,000 $2,300,000 N <br /> Subtotal $3,922,234 $5,229,972 0 <br /> Option MAJOR BUILDING IMPROVEMENTS LOW HIGH <br /> I BUILDING CONNECTORS $2,500,000 $3,500,000 N <br /> I OUTDOOR UPGRADE $545,390 $621,139 N <br /> I :SEWER LINE REPAIR <br /> $340,869 1 $393,893 N <br /> 1 IHAZARDOUS MATERIAL REMOVAL $525,492 $618,987 N <br /> a <br /> :FOOD SERVICE RENOVATIONS $209,596 $281,709 1 N <br /> I ::LIGHTING: ENERGY EFFICIENT LIGHTING UPGRADE $331,197 $386,397 N <br /> I :NEW EMERGENCY GENERATOR LIGHTING $165,708 $275,998 <br /> N <br /> Subtotal i $4,618,253 $6,078,122 0 <br /> Grand Total (2024 Costs w/increased capacity). $31,184,409 $38,343,042 TBD <br /> 2 OPTION: REMOVE 100,200 AND 300 BUILDINGS AND REPLACE WITH 1 $28,000,000 $32,000,000 TED <br /> I NEW BUILDING BUILT TO NCDPI SPECIFICATIONS <br /> Note:The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities <br /> Assessment as well as projects that have been identified since that study.None of the projects listed have been fully funded. <br /> 1 School Gapace ty.,Orange County NG Schools Adequate Public Facilities ordinance(SAPI-U).Annual Membership count November 15, 2019.Level ot <br /> Service(LOS)means the amount(level)of students that can be accommodated(serviced)at certain school system grade group.[i.e.,Elementary/eve/ <br /> (K-5),Middle Level(6-8),High School Level(9-12)]Standards for LOS:Elementary 105%,Middle 107%,High School 110%.Source:Orange County NC <br /> SAPFO Annual Report. Class size reduction phase-in based on House Bill 90(SL 2017).Allotment and average class size in grades K-3 shall beat the <br /> Ifollowing ratios for 2021-2022:Kindergarten(1:18), 1st Grade(1:16),2nd&3rd Grade(1:17). <br /> 12Capacity Impact:YIN(number indicates number of potential seats gained or lost.) <br /> Priority Ranking Key <br /> Kepair,replacement or renovation of items,components or systems that are important to the health and safety of esutudents and <br /> staff and to sustain the overall operation of the facility.General maintaince and system service life upgrades.(state building code <br /> violations,health department violations,handicapped accessibility issues,removal of hazardous material,security issues not <br /> Option I being met by current systems) <br /> Repair and renovation of long-range items that also bring the class size square footage of elementary classrooms to 1,200 sf <br /> Option 2 and/or meet future capacity needs and the Orange County School Building Standards of 585 students for elementary schools. <br /> Repair and long-range improvements that extend a minimum of twenty-five years of additional operation to a facility and meet <br /> Option 3 future capaicty needs or capacity standards of 637 students for elementary schools. <br /> REVISED DATE:1/812022 <br />