Orange County NC Website
38 <br /> GRAVELLY HILL MIDDLE SCHOOL School Capacity' <br /> major capital Projects Requiring Additional Funding SAPFO CAPACITY 7_00 <br /> MEMBERSHIP COUNT 46 <br /> AGE OF SCHOOL/BUILDINGS 2006 <br /> PROJECT PRIORITY&CATEGORY ESTIMATED RANGE OF COST. CAPACITY <br /> IMPACT 2 <br /> Option SAFETY LOW HIGH <br /> .IMPLEMENT SECURITY RECOMMENDATIONS <br /> 1 $199,976 $222,701 N <br /> Subtotal <br /> $199,976 $222,701 0 <br /> Option NEW CONSTRUCTION&BUILDING ADDITIONS LOW HIGH <br /> Subtotal $0 $0 0 <br /> :MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH<10 <br /> OptionLOW HIGH <br /> .YEARS OF USABLE LIFE <br /> .NEW BOILER $242,396 $302,994 N <br /> I NEW CHILLER $605,989 $757,486 N <br /> 1 NEW HVAC COMPONENTS(DOAS,AHU, FCU) $1,042,301 $1,472,553 N <br /> Subtotal $1,890,685 $2,533,034 0 <br /> Option :MAJOR BUILDING IMPROVEMENTS LOW HIGH <br /> .INTERIOR RENOVATIONS: UPGRADE SCIENCE CLASSROOMS TO <br /> a <br /> 3 $90,000 $180,000 N <br /> :DPI STANDARDS <br /> 1 :NEW GENERATOR <br /> $60,599 $75,749 N <br /> a <br /> a <br /> :PAVING/SIDEWALK REPAIR; PAVE REAR <br /> 1 $502,994 $840,994 N <br /> a <br /> :GRAVEL LOT <br /> a <br /> :STORMDRAIN BMP REFURBISHING AND TOPSOIL/SEEDING $151,497 $196,946 N <br /> a <br /> 1 1IGHTING:AUDITORIUM ENERGY EFFICIENT LIGHTING UPGRADE $26,815 $40,904 N <br /> a <br /> Subtotal $831,905 $1,334,593 0 <br /> Grand Total(2024 Costs w/increased capacity): $2,922,567 $4,090,328 0 <br /> Number of mobile units currently on site 0 <br /> Note: The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities <br /> Assessment as well as projects that have been identified since that study.None of the projects listed have been fully funded. <br /> 1 School Capacity:Orange County NC;Schools Adequate Public 1--acIlitles Ordinance(SAPt­-U).Annual membership count November 15, 2019.Level oT— <br /> Service(LOS)means the amount(/eve/)of students that can be accommodated(serviced)at certain school system grade group.[i.e.,Elementary level <br /> (K-5),Middle Level(6-8),High School Level(9-12)]Standards for LOS:Elementary 105%,Middle 107%,High School 110%.Source:Orange County NC <br /> SAPFO Annual Report. Class size reduction phase-in based on House Bill 90(SL 2017).Allotment and average class size in grades K-3 shall be at the <br /> following ratios for 2021-2022:Kindergarten(1:18),1st Grade(1:16),2nd&3rd Grade(1:17). <br /> Rpapacity Impact:YIN(number indicates number of potential seats gained or lost.) <br /> Priority Ranking Key <br /> Kepair,replacement or renovation of items,components or systems that are important to the health and safety of esutudents and <br /> staff and to sustain the overall operation of the facility.General maintaince and system service life upgrades.(state building code <br /> violations,health department violations,handicapped accessibility issues,removal of hazardous material,security issues not <br /> Option 1 �being met by current systems) <br /> Option 2 1 Repair and renovation of long-range items that also bring the class sizes uare footage of elementary classrooms to 1,200 sf <br /> Option 3 I Repair and long-range improvements that extend a minimum of twenty-five years of additional operation to a facility and meet <br /> 'REVISED DATE:1/8/2022 <br />