33
<br /> AL STANBACK MIDDLE SCHOOL School Capacityl
<br /> Major capital Projects Requiring Additional Funding SAPFO CAPACITY i 74_0
<br /> MEMBERSHIP COUNT. 65.1
<br /> AGE OF SCHOOL/BUILDINGS 1995
<br /> PROJECT PRIORITY&CATEGORY ESTIMATED RANGE OF COST. CAPACITY
<br /> IMPACT'
<br /> Option SAFETY LOW HIGH
<br /> I :;IMPLEMENT SECURITY RECOMMENDATIONS $100,000 $140,000 N
<br /> a
<br /> Subtotal i $100,000 i $140,000
<br /> 0
<br /> Option NEW CONSTRUCTION&BUILDING ADDITIONS LOW HIGH
<br /> Subtotal $0 $0 0
<br /> ;MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH<10
<br /> Option LOW HIGH
<br /> .YEARS OF USABLE LIFE
<br /> a
<br /> 1 NEW BOILER $242,396 $302,994 N
<br /> 3 :ENERGY MANAGEMENT SYSTEM UPGRADE $515,091 $721,127 N
<br /> 1 :NEW CHILLER $605,989 $757,486 N
<br /> Subtotal $1,363,475 i $1,781,607 0
<br /> Option MAJOR BUILDING IMPROVEMENTS LOW HIGH
<br /> 3
<br /> .RENOVATE 6TH GRADE CLASSROOM WING $136,348 1 $166,647 N
<br /> a
<br /> 1 ;FOOD SERVICE RENOVATIONS
<br /> $9,090 $10,908 N
<br /> a
<br /> 3 ;:INTERIOR FACILITIES UPGRADES AND REPAIRS: SCIENCE Room I
<br /> $252,495 $378,743 N
<br /> 1 :LIGHTING: ENERGY EFFICIENT LIGHTING UPGRADE $745,366 $975,642 N
<br /> 1 ::NEW EMERGENCY GENERATOR LIGHTING $309,054 $515,091 N
<br /> :EXTERIOR RECOMMENDED REPAIRS $605,989 $681,738 N
<br /> a
<br /> Subtotal $2,058,342 $2,728,768
<br /> 0
<br /> Grand Tota13(2024 cost estimate):. $3,521,818 $4,650,376 0
<br /> Number of classrooms below DPI minimums sf: TBD Number of mobile units: 0
<br /> Note: The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities
<br /> Assessment as well as projects that have been identified since that study.None of the projects listed have been fully funded.
<br /> I School Capacity:Orange County NC Schools Adequate Public Facilities Ordinance(SAPFO).Annual membership count November 15,2019. Optionof
<br /> Service(LOS)means the amount(/eve/)of students that can be accommodated(serviced)at certain school system grade group.[i.e.,Elementary
<br /> Option(K-5),Middle Option(6-8),High School Option(9-12)]Standards for LOS:Elementary 105%,Middle 107%,High School 110%.Source:Orange
<br /> County NC SAPFO Annual Report. Class size reduction phase-in based on House Bill 90(SL 2017).Allotment and average class size in grades K-3
<br /> shall be at the following ratios for 2021-2022:Kindergarten(1:18), 1st Grade(1:16),2nd&3rd Grade(1:17).
<br /> 2 Impact:YIN(number indicates number of potential seats gained or lost.)
<br /> 3 Annual inflationary construction cost is calculated at 6%.
<br /> Priority Ranking Key
<br /> Repair,replacement or renovation of items,components or systems that are important to the health and safety of the students and
<br /> staff and to sustain the overall operation of the facility.General maintaince and system service life upgrades.(state building code
<br /> violations,health department violations,handicapped accessibility issues,removal of hazardous material,security issues not
<br /> Optionl being met by current systems)
<br /> Repair and renovation of long-range items that also bring the class size square footage of elementary classrooms to 1,200 sf
<br /> Option2 and/or meet future capacity needs and the Orange County School Building Standards of 585 students for elementary schools.
<br /> uprionf I Repair and renovation of long-range items that also bring the class size square footage of elementary classrooms to 1,200 sf
<br /> REVISED DATE:2/20/20
<br />
|