Orange County NC Website
111 <br /> PART Two CAPS SYSTEM <br /> A test of new development impacts using Student <br /> Generation Rates (SGR's) against available capacity <br /> CAPS issued if capacity exists, OR <br /> CAPS deferred until Part 1 CIP needs and associated <br /> funding for more capacity is achieved <br /> ■ Historically, the identification of future CIP capacity <br /> has been far enough in advance to foresee and <br /> construct new capacity without CAPS deferral <br /> CAPS system was previously suspended for a certain <br /> school level in 2005 until new capacity was <br /> constructed for a certain level <br />