| 
								          																		33
<br />   				AL STANBACK MIDDLE SCHOOL     			School Capacityl
<br />   				Major capital Projects Requiring Additional Funding 			SAPFO CAPACITY i      74_0
<br />       														MEMBERSHIP COUNT.      65.1
<br />       	AGE OF SCHOOL/BUILDINGS       							1995
<br />       	PROJECT PRIORITY&CATEGORY						ESTIMATED RANGE OF COST.  CAPACITY
<br />																		IMPACT'
<br /> 		Option   SAFETY   									LOW     	HIGH
<br />    		I     :;IMPLEMENT SECURITY RECOMMENDATIONS       			$100,000 	$140,000    	N
<br />  			a
<br />  								Subtotal    			i     $100,000    i    $140,000
<br />     																		0
<br /> 		Option   NEW CONSTRUCTION&BUILDING ADDITIONS				LOW     	HIGH
<br />  								Subtotal     				$0		$0       	0
<br />  			;MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH<10
<br /> 		Option       										LOW     	HIGH
<br />  			.YEARS OF USABLE LIFE
<br />   															a
<br />    		1      NEW BOILER   								$242,396 	$302,994    	N
<br />    		3     :ENERGY MANAGEMENT SYSTEM UPGRADE				$515,091 	$721,127    	N
<br />    		1     :NEW CHILLER  								$605,989 	$757,486    	N
<br />  								Subtotal 				$1,363,475   i   $1,781,607   	0
<br /> 		Option   MAJOR BUILDING IMPROVEMENTS    					LOW     	HIGH
<br />    		3
<br />  			.RENOVATE 6TH GRADE CLASSROOM WING 				$136,348    1    $166,647    	N
<br />  			a
<br />    		1     ;FOOD SERVICE RENOVATIONS
<br />      													$9,090   	$10,908    	N
<br />  			a
<br />    		3     ;:INTERIOR FACILITIES UPGRADES AND REPAIRS: SCIENCE Room   I
<br />     													$252,495 	$378,743    	N
<br />    		1     :LIGHTING: ENERGY EFFICIENT LIGHTING UPGRADE			$745,366 	$975,642    	N
<br />    		1     ::NEW EMERGENCY GENERATOR LIGHTING  				$309,054 	$515,091    	N
<br />  			:EXTERIOR RECOMMENDED REPAIRS					$605,989 	$681,738    	N
<br />  			a
<br />  								Subtotal 				$2,058,342       $2,728,768
<br />     																		0
<br />  								Grand Tota13(2024 cost estimate):.    $3,521,818       $4,650,376   	0
<br />       	Number of classrooms below DPI minimums sf:      TBD      			Number of mobile units:     	0
<br />       	Note: The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities
<br />       	Assessment as well as projects that have been identified since that study.None of the projects listed have been fully funded.
<br />       	I School Capacity:Orange County NC Schools Adequate Public Facilities Ordinance(SAPFO).Annual membership count November 15,2019. Optionof
<br />       	Service(LOS)means the amount(/eve/)of students that can be accommodated(serviced)at certain school system grade group.[i.e.,Elementary
<br />       	Option(K-5),Middle Option(6-8),High School Option(9-12)]Standards for LOS:Elementary 105%,Middle 107%,High School 110%.Source:Orange
<br />       	County NC SAPFO Annual Report. Class size reduction phase-in based on House Bill 90(SL 2017).Allotment and average class size in grades K-3
<br />       	shall be at the following ratios for 2021-2022:Kindergarten(1:18), 1st Grade(1:16),2nd&3rd Grade(1:17).
<br />       	2 Impact:YIN(number indicates number of potential seats gained or lost.)
<br />       	3 Annual inflationary construction cost is calculated at 6%.
<br />       	Priority Ranking Key
<br />   			Repair,replacement or renovation of items,components or systems that are important to the health and safety of the students and
<br />   			staff and to sustain the overall operation of the facility.General maintaince and system service life upgrades.(state building code
<br />   			violations,health department violations,handicapped accessibility issues,removal of hazardous material,security issues not
<br />		Optionl   being met by current systems)
<br />   			Repair and renovation of long-range items that also bring the class size square footage of elementary classrooms to 1,200 sf
<br />		Option2  and/or meet future capacity needs and the Orange County School Building Standards of 585 students for elementary schools.
<br />		uprionf  I Repair and renovation of long-range items that also bring the class size square footage of elementary classrooms to 1,200 sf
<br />       	REVISED DATE:2/20/20
<br />
								 |