Browse
Search
2022-563-E-AMS-Pine Shore Energy-EV Charger Installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-563-E-AMS-Pine Shore Energy-EV Charger Installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 2:06:02 PM
Creation date
10/27/2022 2:05:26 PM
Metadata
Fields
Template:
Contract
Date
10/20/2022
Contract Starting Date
10/20/2022
Contract Ending Date
10/26/2022
Contract Document Type
Contract
Amount
$40,847.72
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Directory <br />Orange County <br />Amy Eckberg <br />Sustainability Program Manager <br />Aeckgerg@orangecountync,gov <br />(919) 245-2626 <br />Vendor (State Contractor 691A) <br />David Thompson <br />Pine Shore Energy LLC <br />131 Fayette Street <br />Winston-Salem, NC 27101 <br />(833) 332-1266 <br />PROJECT SPOTLIGHT: <br />NC Governor Roy Cooper signed NC Executive Order NO. 246 on <br />January 7, 2022 to strenghten earlier commitments express in Executive <br />Order NO. 80. Its highlights include, <br />1. An increase in the number of registered, zero-emission vehicles <br />(ZEVs) to at least 1,250,000 by 2030 and increase sales of ZEV so that <br />50% of in-state sales of new vehicles are zero emissions by 2030; <br />2. Reduce energy consumption per square foot in state-owned buildings <br />by at least 40% from fiscal year 2002-2003 levels. <br />This Orange County Level 2 EV Charging project supports the State's <br />inititiative and strengthens Orange County's resiliency profile by following <br />established industry standards integrating smart charging to facilities. <br />This includes connection to Orange County's 'Evergreen' system -the EV <br />Charging Network owned & operated by Orange County. 'Evergreen is a <br />Dynamic Load Manangement system to minimize utility costs, ensures <br />charge cycle reliability and monitors usage. <br />AppCTRL® Smart EV Charging Pedestal <br />UL Rainproof TYPE 3R <br />AppCTRL® enabled L2 EVSE <br />(ClipperCreek and/or Tesla) <br />AppCTRL® SmartRack w/ <br />AppCTRL®Smart Controls (UL 508A) <br />Inside Locked Enclosure.Cover <br />Exterior Wall of <br />Hillsboro Parking Deck <br />AppCTRL® SmartWire <br />ARC156 UL C(UL) CL3P, <br />Suitable for Outdoor/Wet Locations <br />Made in USA <br />Sheet Title: <br />Date <br />: <br />Designed by: <br />Pine Shore Energy LLC <br />131 Fayette St NW <br />Winston-Salem, NC 27101 <br />©2021 <br />828-553-6257 <br />Dave@pineshoreenergy.com <br />www.pineshoreenergy.com <br />THIS DRAWING IS NOT TO BE SCALED <br />FOR CONSTRUCTION PURPOSES. THE <br />SCALE WHEN INDICATED IS FOR <br />GENERAL REFERENCE ONLY. <br />Project #: <br />STATEWIDE TERM <br />CONTRACT 691A <br />ELECTRIC VEHICLE <br />CHARGING STATION <br />EQUIPMENT, <br />ACCESSORIES, <br />INSTALLATION & <br />INFRASTRUCTURE <br />Planning Phase: <br />THE IDEAS, DESIGNS, DRAWINGS, <br />AND SPECIFICATIONS <br />REPRESENTED HERE ARE AND <br />SHALL REMAIN THE PROPERTY OF <br />PINESHORE AND ANY <br />REPRODUCTIONS, REUSE, SALE <br />OR OTHER DISPOSITION OF THESE <br />DOCUMENTS FOR OTHER THAT THE <br />SPECIFIC PROJECT FOR WHICH <br />THEY HAVE BEEN PREPARED AND <br />DEVELOPED IS EXPRESSLY <br />FORBIDDEN WITHOUT WRITTEN <br />CONSENT OF THE ARCHITECT <br />AND/OR ENGINEER. VISUAL <br />CONTACT WITH THESE DRAWINGS <br />OR SPECIFICATIONS SHALL <br />CONSTITUTE EVIDENCE OF THE <br />ACCEPTANCE OF THESE <br />RESPRICTIONS © <br />COPYRIGHT BY PINESHORE <br />C:\Users\dave\Documents\Pineshore\Projects\3. project_quotes\Orange County\OC_Parking_Deck_Level-1_expansion\dwg\OC_Eno_River_EVSE expansion on Level1.rvt 4/30/2022 12:44:10 PM <br />E0 <br />Q-043022 <br />Orange County <br />Additional EV Charging for <br />Eno River Parking Deck <br />DT <br />Cover Sheet <br />Nash & Kollock Street <br />Hillsboro, NC 27278 <br />April 30, 2022 <br />Conceptual <br />Design <br />NOT TO SCALE2Typical Level 2 Smart Charging System <br />NOT TO SCALE1Site Location <br />DocuSign Envelope ID: 20D5AF1C-FDB6-4AFB-9DCD-9619F78371CA
The URL can be used to link to this page
Your browser does not support the video tag.