Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:53:54 PM
Creation date
9/29/2022 3:46:04 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 10-03-2022 Business Meeting
Minutes 10-03-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 <br /> (b) Hearings held pursuant to this sub-subsection shall be conducted by the <br /> Orange County Planning Board within 30 days after receipt of written <br /> demand, as provided for in (A)(2) above. <br /> (c) The Orange County Planning Board shall make recommendations to the <br /> Board of County Commissioners within 30 days after the date of the <br /> hearing on such Fr^c�gsigp^n Erosion and Sedimentation Control Plan. <br /> (d) The Board of County Commissioners will render its final decision on any <br /> FrQs'Qri^^^ Erosion and Sedimentation Control Plan appeal within 30 days <br /> of receipt of the Planning Board recommendation. <br /> (2) Other than Orange County <br /> (a) This sub-subsection pertains to appeals for Lland-Ddisturbing AacthAties <br /> occurring within the corporate limits of the Towns of Chapel Hill, <br /> Carrboro, and Hillsborough, and the City of Mebane. <br /> (b) Hearings held pursuant to this sub-subsection shall be conducted by a <br /> designated agency of the appropriate town or city board within 30 days <br /> after receipt of written demand, as provided for in (A)(2) above. <br /> (c) The said designated agency shall make recommendations to the <br /> appropriate town or city board within 30 days after the date of the <br /> hearing on such FrcTosiop^n Erosion and Sedimentation Control Plan. <br /> (d) The said appropriate town or city board will render its final decision on <br /> any Fr9;^„ Erosion and Sedimentation Control Plan appeal within 30 <br /> days of the receipt of the recommendations from the said designated <br /> agency conducting the hearing. <br /> (C) Appeal from Local Government's Decision <br /> If the local governing body upholds the disapproval or modification , <br /> of a proposed Frosiop Erosion and Sedimentation Control Plan <br /> following the public hearing, the applicant shall be entitled to appeal the local <br /> government's action to the North Carolina Sedimentation Control Commission as <br /> provided in Section 113A-61(c) of the General Statutes and Title 15A NCAC 4B.0118. <br /> (D) Appeal of Erosion and Sedimentation Control Plan if Disapproval Based on <br /> Applicant's Past Performance <br /> The applicant may appeal disapprovals issued under the provisions of Section 2.19.11 of <br /> this Ordinance directly to the North Carolina Sedimentation Control Commission. <br /> (E) Appeal of Land-Disturbing Stop Work Order <br /> (1) The person conducting the la-Ad-d st irh n„ aGti,4yLand-Disturbing Activity may <br /> appeal a stop work order to the Board of County Commissioners within a period <br /> of five days after the order is issued. <br /> (2) Notice of the appeal shall be given in writing to the Board of County <br /> Commissioners, with a copy to the Erosion Control Officer. <br /> (3) The Board of County Commissioners shall conduct a hearing at their next <br /> scheduled business meeting at which the appellant and the Erosion Control <br /> Officer or Inspector shall be permitted to submit relevant evidence, and shall rule <br /> on the appeal as expeditiously as possible. <br /> (4) Pending the ruling by the Board of County Commissioners on an appeal, no <br /> further work shall take place in violation of a stop work order. <br /> Orange County, North Carolina— Unified Development Ordinance Page 2-79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.