Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:53:54 PM
Creation date
9/29/2022 3:46:04 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 10-03-2022 Business Meeting
Minutes 10-03-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br /> (1) The Erosion Control Officer shall forward one copy of the Er^crvmvri^n Erosion and <br /> Sedimentation Control PlanGertreI Rlap to the Orange Soil and Water <br /> Conservation District at least 30 days prior to the commencement of the <br /> proposed asfiv+yLand-Disturbinq Activity. <br /> (C) The Erosion Control Officer shall forward one copy of the Frosioi^n Erosion and <br /> Sedimentation Control PlanGe+tel RIAA to the Director of the NC Division of Energy, <br /> Mineral, and Land Resources41 � <br /> for any land diRtUrhiAg ati,At„Land- <br /> Disturbing Activity that involves the utilization of ditches for the purpose of de-watering or <br /> lowering the water table. <br /> 2.19.3 Components of Complete Erosion and Sedimentation Control PlanS42 <br /> (A) Generally <br /> Erosion and Sedimentation Control Plans shall meet the requirements of the most current <br /> version of the North Carolina Administrative Code Title 15A Chapter 4: Sedimentation <br /> Control, and the most current version of the North Carolina Erosion and Sediment Control <br /> Planning and Design Manual (NC Erosion Control Manual).43 <br /> In order to be considered complete, a plan submitted for approval must contain the <br /> proposed Erosion Erosion and Sedimentation Control PlanCei trQl Pl n, the completed <br /> application, the statement of financial responsibility and ownership, and the plan review <br /> fee. The 30-day review period begins when all of the components of the complete plap <br /> Erosion and Sedimentation Control Plan are received. <br /> (B) Erosion and Sedimentation Control Plan Content <br /> (1) The Erosion and Sedimentation Control Plan required by this section shall <br /> contain such architectural and/or44 engineering drawings, maps, assumptions, <br /> calculations, and narrative statements as are needed to adequately describe the <br /> proposed development of the tract and the measures planned to comply with the <br /> requirements of this Ordinance. <br /> (2) The Erosion and Sedimentation Control Plan shall comply with all applicable <br /> State and local regulations for erosion and sediment control. <br /> (3) Erosion and Sedimentation Control PlanP4an content may vary to meet the needs <br /> of specific site requirements. <br /> (C) Review of Other Environmental Documents <br /> (1) Any plan-Erosion and Sedimentation Control Plan submitted for a Land- <br /> Disturbing Activity land_, s - T for which an environmental document <br /> (either an assessment or impact statement) is required by the North Carolina <br /> Environmental Policy Act(G.S. 113A-1, et seq.) shall be deemed incomplete until <br /> a complete environmental document is available for review. <br /> (2) The Erosion Control Officer shall promptly notify the person submitting the plan <br /> Erosion and Sedimentation Control Plan that the 30-day review period of the plan <br /> Erosion and Sedimentation Control Plan pursuant to Section 2.19.5 of this <br /> Ordinance shall not begin until a complete environmental document is available <br /> for review. <br /> (3) The approval of the Fsi^n Erosion and Sedimentation Control PlanGeAtml—Plan <br /> is conditioned on the applicant's compliance with Federal and State Water <br /> Quality laws, regulations, and rules. <br /> (D) Financial Responsibility and Ownership <br /> 41 Appropriate Division name. <br /> 42 Text correction—added "s". <br /> 43 E&SC plans mustfollowthe most current Chapter 4and Design Manual guidelines. <br /> 44 Text correction—added "/or". <br /> Orange County, North Carolina— Unified Development Ordinance Page 2-63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.