Orange County NC Website
21 <br /> (1) Filling activities include, but are not limited to, construction of road crossings, <br /> sewer or utility line installations, grading, placement of spoil from ditching or other <br /> excavations, or placement of fill for commercial or residential development. <br /> (2) A wetlands determination and specific permit requirements may be obtained from <br /> the Raleigh Field Office of the U.S. Army Corps of Engineers. <br /> Orange County, North Carolina— Unified Development Ordinance Page 2-60 <br />