Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:53:54 PM
Creation date
9/29/2022 3:46:04 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 10-03-2022 Business Meeting
Minutes 10-03-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br /> (c) Auxiliary documents prepared in accordance with Article 7 of this <br /> Ordinance which ensure completion and/or maintenance of required <br /> improvements. Such documents may include, but not be limited to, a <br /> private road maintenance agreement, <br /> any necessary Performance Guarantees <br /> for required improvements; and guarantee of installation of any required <br /> road signs; <br /> (d) A copy of the Final Plat indicating approval of the plan to control <br /> sedimentation and erosion during construction of improvements. Where <br /> an orncinn and sQd0moAt@tion nnntrol 4apErosion and Sedimentation <br /> Control Plan12 is required, it shall comply with the provisions of Section <br /> 6.15 of this Ordinance. If an <br /> phinErosion and Sedimentation Control Plan 13 is not required, the copy <br /> of the Final Plat must be signed by the Erosion Control Officer certifying <br /> that a plan waiver has been approved or the amount of land disturbance <br /> on the site is not subject to the provisions of Section 6.15 of this <br /> Ordinance; and <br /> (e) A statement describing the methods proposed to protect environmental <br /> resources identified in "An Inventory of Sites of Cultural, Historic, <br /> Recreational, Biological and Geological Significance in the <br /> Unincorporated Portions of Orange County" and/or "Inventory of the <br /> Natural Areas and Wildlife Habitats of Orange County, North Carolina". <br /> (B) Review and Action <br /> (1) The Planning Director shall determine if the plat and application conform with all <br /> applicable regulations. <br /> (2) Auxiliary documents required by Article 7 shall be submitted by the Planning <br /> Director to the County Attorney for review and recommendation. <br /> (3) The Planning Director may submit copies of the Final Plat application and <br /> accompanying material to other officials and agencies for review and comment. <br /> Other potential reviewers include, but are not limited to: <br /> (a) NC DOT, <br /> (b) Orange County Schools, <br /> (c) Orange County Land Records, <br /> (d) County Attorney, <br /> (e) Orange County Environmental Health, <br /> (f) Orange County Erosion Control, <br /> (g) Orange County Engineering, <br /> (h) Public Utility Companies, and <br /> (i) Orange County Department of Environment, Agriculture, Parks and <br /> Recreation (DEAPR). <br /> (4) Reviewers shall provide a certification to the Planning Director of the suitability, <br /> provisional suitability, or unsuitability of the proposal. Recommendations of the <br /> reviewers may be incorporated as conditions of approval of the subdivision. <br /> (5) The Planning Director shall take action on an application solely on his/her <br /> findings as to compliance with applicable regulations and conditions and shall <br /> either: <br /> iz Consistent use of"Erosion and Sedimentation Control Plan"as defined in 15A NCAC 02H.1002(Definitions). <br /> is Consistent use of"Erosion and Sedimentation Control Plan"as defined in 15A NCAC 02H.1002(Definitions). <br /> Orange County, North Carolina— Unified Development Ordinance Page 2-44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.