Orange County NC Website
13 <br /> 2.5.7 Additional Requirements for Overlay Districts <br /> (A) Efland-Cheeks Highway 70 Corridor Overlay District <br /> (1) Approval Requirements <br /> Within the Efland-Cheeks Highway 70 Corridor Overlay District (ECOD), no <br /> construction activity shall begin nor shall any conversion of existing single-family <br /> residence to a non-residential land use, excavation, soil removal, grading or <br /> disturbance of vegetation including trees, or Ltand--Disturbing Activitydis#6irbing <br /> ashy associated with a non-residential land use, be commenced, nor any sign <br /> erected until such time as a site plan has been approved and a permit issued by <br /> the Planning Director in accordance with this Section and -Section 2.4 of this <br /> Ordinance. <br /> (B) Efland Interstate Overlay District <br /> (1) Approval Requirements <br /> Within the Efland Interstate Overlay District, no construction activity shall begin <br /> nor shall any excavation, soil removal, filling, grading or disturbance of <br /> vegetation, including trees, be commenced, nor any sign erected for any use <br /> subject to the requirements of the overlay district until such time as a site plan <br /> has been approved and a permit issued by the Planning Director in accordance <br /> with this Section and Section 2.4 of this Ordinance. <br /> (C) Efland Village Overlay District <br /> (1) Approval Requirements <br /> Within the Efland Village Overlay District, no construction activity shall begin nor <br /> shall any excavation, soil removal, filling, grading or disturbance of vegetation, <br /> including trees, be commenced, nor any sign erected for any use subject to the <br /> requirements of the overlay district until such time as a site plan has been <br /> approved and a permit issued by the Planning Director in accordance with this <br /> Section and Section 2.4 of this Ordinance. <br /> (D) Major Transportation Corridor Overlay District <br /> (1) Approval Requirements <br /> Within the Major Transportation Corridor District, no construction activity shall <br /> begin nor shall any excavation, soil removal, filling, grading or disturbance of <br /> vegetation, including trees, be commenced, nor any sign erected until such time <br /> as a site plan has been approved and a permit issued by the Planning Director in <br /> accordance with this Section and Section 2.4 of this Ordinance. <br /> 2.5.8 Additional Requirements for Economic Development Districts <br /> (A) Prior to submission of an application for site plan approval, applicants shall meet with <br /> representatives of the Planning and Inspections, and Economic Development <br /> Departments to identify policies, procedures, regulations, and fees applicable to <br /> development proposals. <br /> (B) Any proposed subdivision in an Economic Development District shall follow the approval <br /> procedures as specified in Section 2.16. <br /> (C) In addition to the submittal requirements contained in this Section, a complete application <br /> shall also include: <br /> (1) Building elevation drawings for each proposed structure; and <br /> CompliancePermit or Subdivision finaI plat approval. This is a simple reference to the new section dealing with <br /> Performance Gua ra ntees. <br /> Orange County, North Carolina— Unified Development Ordinance Page 2-13 <br />