Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:53:54 PM
Creation date
9/29/2022 3:46:04 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 10-03-2022 Business Meeting
Minutes 10-03-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> Failure to meet the criteria for site plan approval listed herein, and/or to address all <br /> review comments solicited during plan review, will result in denial of the application. <br /> (F) If a plan is approved with conditions, no zoning authorization allowing Lland- <br /> Disturbinadis# Activit ya 4 or subsequent building permit shall be issued until all <br /> conditions of approval have been met to the satisfaction of Orange County. <br /> (G) Site plan approval and the issuance of a Zoning Compliance Permit does not establish a <br /> vested right to develop the property should zoning regulations change subsequent to plan <br /> approval. <br /> 2.5.5 Vesting of Site Plan <br /> (A) At the option of the Applicant, a site plan may be vested for a period of not less than two <br /> nor more than five years. Multi-phased developments, as defined in NCGS 160D-108, <br /> shall be vested for a period of seven years from the time a site plan approval is granted <br /> for the initial phase of the multi-phased development. <br /> (B) To become vested, a site specific vesting plan must be approved by the Board of County <br /> Commissioners through either the normal project approval process if the Board of County <br /> Commissioners is the approval authority, or, in the case the Board of County <br /> Commissioners is not the normal approval authority, by the Board of County <br /> Commissioners after a legislative hearing. <br /> (1) Said legislative hearing shall follow the public notification procedures set forth in <br /> Section 2.8.7. <br /> (2) The Board of County Commissioners may approve the site specific vesting plan <br /> with such terms and conditions as may reasonably be necessary to protect the <br /> public health, safety, and welfare. Such conditional approval shall result in a <br /> vested right. Failure to abide by such terms and conditions shall result in a <br /> forfeiture of vested rights. <br /> (C) An approved site specific vesting plan shall contain the following statement: "Approval of <br /> this plan establishes a zoning vested right under NCGS 160D-108. Unless terminated at <br /> an earlier date, the zoning right shall be valid until <br /> (D) The site specific vesting plan for a project which requires the preparation of an <br /> Environmental Impact Statement (EIS) in accordance with Section 6.16 of this Ordinance <br /> shall not be approved until the EIS has been made available for public review, and has <br /> been presented to the Board of County Commissioners in accordance with Section 2.23 <br /> of this Ordinance. <br /> 2.5.6 ua ra n to a of 1 m prove m Performance Guarantees <br /> (B) The 9W@Pante@ shall ho effenti�ie fnr 9:mnnt�c AAd shall inrludg the rust of the <br /> i^m'�r'rn�menu PI is 10a4-. <br /> (C) Prior to is;g_i_,A_Ac;A_ of any sit@ plan approval, the guarantee shall be approved by the <br /> the s-a-fis-faction of the County prior to of the zoning compliapce per <br /> (A) If a Performance Guarantee is required, the provisions of Section 2.27 of this Ordinance <br /> shall apply.8 <br /> 8 Consistentwith Session Law 2019-79,and to avoid confusion,staff has created a central section addressingthe <br /> review/process i ng/a ccepta nce of Performance Guarantees for projects involving the i ss ua nce of a Zoning <br /> Orange County, North Carolina— Unified Development Ordinance Page 2-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.