Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:43:22 PM
Creation date
9/29/2022 3:33:58 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 10-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standa[p <br /> Section 6.15:Soil Erosion and Sedimentation Contro1268F <br /> Requirements, standards, and specifications for <br /> Erosion and Sedimentation Control Plans276 and erosion <br /> control techniques, measures, and devices are contained in the Orapq@ County Soil <br /> most current version of t#Ia-the North Carolina <br /> Administrative Code Title 15A Chapter 4: Sedimentation Control, and the most current <br /> version of the North Carolina Erosion and Sediment Control Planning and Design Manual <br /> (NC Erosion Control Manual L77— C`()r.ioc of tho nnRAUQ1 Pro A,h,lablA from tho ErAsinn <br /> z78 <br /> (B) Revisions to t#iaOrange County Erosion Control279 Standards <br /> Corrections, revisions, and amendments to the Soil Erosion apd GAAtrol <br /> Ma+xalOrange County erosion control standards280 shall be made upon recommendation <br /> of the Erosion Control Officered-approval by the Planning Director, and approval by <br /> the281 Orange County Board of Commissioners. <br /> (C) Consistency Between Ordinance and Orange County Erosion Control282 Standards <br /> Nothing in this Section shall be construed to allow approval of a-planan LDP which is <br /> inconsistent with the mandatory standards set forth in Section 6.15.7(B) of this Ordinance <br /> or any other provision of this Ordinance. <br /> 6.15.4 Exclusions <br /> The regulations established within this Section shall not apply to the following land---disturbing <br /> activities: <br /> (A) Agriculture <br /> Activities, including the production and activities relating or incidental to the production of <br /> crops, grains, fruits, vegetables, ornamental and flowering plants, dairy, livestock, poultry, <br /> and all other forms of agriculture283 undertaken on agricultural land for the production of <br /> plants and animals useful to man, including, but not limited to: <br /> (1) Forage& and sod crops, grain& and feed crops, tobacco, cotton and peanuts_; <br /> (2) Dairy animals and dairy products,.; <br /> (3) Poultry and poultry productsr; <br /> (4) Livestock, including beef cattle, llamas, sheep, swine, horses, ponies, mules or <br /> goats, including the breeding and grazing of any or all such animals, <br /> (5) Bees and apiary products,;and <br /> (6) Fur producing animals, and <br /> 216 Consistent use of"Erosion and Sedimentation Control Plan"as defined in 15A NCAC 02H.1002(Definitions)- <br /> NOTE. "Erosion and Sedimentation Control Plan"is integrated through the remainder of Section 6.15,where <br /> applicable. <br /> 277 Correct reference to North Carol i na Admi nistrati ve Code Title 15A Chapter 4 and the Erosion a nd the Sedi ment <br /> Control Planning and Design Manual (NC Erosion Control)-NOTE. "NC Erosion Control Manual"is integrated <br /> through the remainder of Section 6.15,where applicable. <br /> 278 The Division does not provide copies ofthe Manual to the public,this statement has been deleted. <br /> 271 Clarification thatthis sub-section is specificto"Orange County erosion control standards". <br /> 280 Clarification thatthis sub-section is specificto"Orange County erosion control standards". <br /> 281 Planning Director approval of"Orange County erosion control standards"is needed priorto BOCC approval. <br /> 212 Clarification thatthis sub-section is specificto"Orange County erosion control standards". <br /> 283 Revised to reflect the most current version of NCDEQ's model ordinancefor E&SC.; revised per NCDEQ peer <br /> review comment. <br /> Orange County, North Carolina- Unified Development Ordinance Page 6-118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.