Orange County NC Website
Article 6: Development Standa" <br /> Section 6.14:Stormwater Management <br /> if the _Roard of County Commissioners does- 'Pot aGcept the repo# <br /> and rej@Gts the petition, it shall pr&Ade the developer k4ith <br /> for the re-le-Ase of the p@PfQrPAAP(;@ WAG! AP AthAP 5;@GWrity. <br /> (4(5)—Annual SCM235 Inspection Required <br /> (a) All SCMs shall be inspected by the owning entity at least on an annual <br /> basis to determine whether the SCM is236 performing as <br /> designed and intended. <br /> (b) Records of inspections shall be submitted annually to the Erosion <br /> Control Officer on forms approved by Orange County. <br /> (c) Annual inspections shall begin within one year of the filing date of the <br /> deed for the 212M issuance of the Certificate of Stormwater Compliance <br /> for the SCM.237 <br /> (d) The Erosion Control Officer will inspect each SCM approved pursuant to <br /> these rules approximately every five years. In the event the Erosion <br /> Control Officer discovers the need for corrective action of improvements, <br /> he/she shall notify the owning entity of the needed SCM238 improvements <br /> and the date by which the corrective action is to be completed. All <br /> SCM239 improvements shall be made consistent with the pl@AS @Ad <br /> mei AtQAQ ono r,I@r, or rr,aAwaapproved SMP and the approved OMA.240 <br /> After notification by the owning entity, the Erosion Control Officer shall <br /> inspect and approve the completed SCM241 improvements. <br /> (5Ak A n,,2I 5-Year SCM242 Maintenance Inspection Fee <br /> (a) The F-@�5-year SCM maintenance inspection fee for the first 5-year <br /> ep riod243 shall be paid before: <br /> (i) The <br /> issuance of the Certificate of Stormwater <br /> Compliance for the SCM.244 <br /> (ii) The <br /> release of up to 75% of the value of the <br /> SCM Performance Guarantee.245 <br /> (b) The fee-5-year SCM maintenance inspection fee shall be based upon the <br /> current Orange County Planning Fee Schedule, and shall be paid to <br /> Orange County following each mal-5-year SCM246 inspection. <br /> 235 Clarification thatan annual inspection ofthe"SCM" is required. <br /> 236 Reference to the "SCM" ratherthan "controls". <br /> 231 Clarification of requi rements. <br /> 238 Clarification thatthis is referencing"SCM" improvements. <br /> 239 Clarification thatthis is referencing"SCM" improvements. <br /> 240 Clarification of requi rements. <br /> 241 Clarification thatthis is referencing"SCM" improvements. <br /> 242 Correct reference to the S-year inspection fee. Orange County does not require annual SCM inspectionfees- <br /> NOTE. "5-year SCM maintenance inspection fee"is integrated through the remainder of Section 6.14,where <br /> warranted. <br /> 243 Clarification of requi rements,AND based on Legal Sufficiency Review comments. <br /> 244 Cl a ri ficati on of requi rements. <br /> 241 Clarification ofrequirements. <br /> 246 Cl a ri ficati on of requi rements. <br /> Orange County, North Carolina- Unified Development Ordinance Page 6-110 <br />