Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:43:22 PM
Creation date
9/29/2022 3:33:58 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 10-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standar <br /> Section 6.14:Stormwater Management <br /> (c) All SCM231 improvements shall be made consistent with the approved <br /> plans and specificatieps of t'he SCM And, the operations and <br /> SMP, the approved OMA, and the approved <br /> OMP.232 <br /> (C) Inspections; ;and Rala;aga of <br /> 233 <br /> (aa) The crnn shall ho insnerterl by the Frncinn GOAtMI Offiger, after�ohe- <br /> en�m``Y gtifi� s hhFrp.�hor that all Werk has boon (;QMPIetRd 4t this; <br /> insnertign the QWAiA9 entity shall pro�Ad@• <br /> the 2C.M. rp_ady for filing with the Orange GOWAty <br /> Register of Deeds; and <br /> tho oxtont that tho Gt;npral Statute, Chapter 89A, allow) stating <br /> S- <br /> 0 <br /> 1A/ater5;hQd Prntertinn GQMPlianGe Permit fgr the SCM-.2-34 <br /> re-inspeGted. <br /> (3) Re Ie;as_@ of Remaining SeGu ifv <br /> intenaAge agreement the rleyel C)P@r may rietitinn the Rnard gf CO Aty <br /> (b) Upon r@Geipt of said petition, th@ Erogiop C-QptrQl QffirAr hall 0ASPOE4 t <br /> ii-FW A d Ad <br /> (G) The Erosiep Control Qfficer shall present the petition, insPE)Gti0A report <br /> A-pd rec-,onAmendations- to the _Board of County CommissionArs <br /> @GG@PtS the POtitIGA, the developer shall deposit with Or@Ag@ <br /> GOWAty a Gash aMGWAt @96-Al to that described iA Se <br /> zsi Clarification that improvements are specific to"SCMs" only. <br /> zsz <br /> Clarification of SCM repair or reconstruction requirements. <br /> zss SCM Performance Guarantee requirements have been moved to Section 6.22(NEW SECTION). <br /> to GI arif„+he Gerr@Gt req6li rempAtl;. <br /> Orange County, North Carolina— Unified Development Ordinance Page 6-109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.