Orange County NC Website
Article 6: Development Standaola <br /> Section 6.14:Stormwater Management <br /> (ii) What specific quantitative criteria will be used for determining <br /> when those actions are to be taken, and <br /> (iii) Who is responsible for those actions, consistent with the <br /> OMA. <br /> (b) 223The standard ITI@iAt@A@PG@ plapQMP shall specifically address, but is <br /> not limited to: <br /> (i) AAY mGwi4qMowing of permanent vegetation, <br /> (ii) A^Y removalRemoval of woody vegetation (e.g. bushes, shrubs <br /> and trees) from the dam ^f a w@t d@t@Atinn ^^^dany dam <br /> and/or 224 berm structures, <br /> (iii) Reseeding of any eroding areas , <br /> Vis, <br /> (iv) Replacement+ng of impaired vegetation <br /> (v) Removal of sediment and/or debris from the 'trash rQGk' GA aAY <br /> inlet and outlet channels, inlet <br /> and outlet pipes, forebays, trash racks, and riser or barrel <br /> structures225, and <br /> (vi) Repair of any damage/deterioration to structural aspects of wEA <br /> R;4nd filtp-rsthe SCM. <br /> (c) The PlanOMPshall clearly indicate the steps that will be taken for <br /> restoring a SCM to its design specifications if an SCM226 failure occurs. <br /> (3) Landscaping and Grounds Maintenance <br /> (a) Landscaping and grounds maintenance shall be the responsibility of the <br /> owning entity. <br /> (b) Vegetation shall not be established or allowed to mature to the extent <br /> that the integrity or functionality227 of the SCM is <br /> diminished or threatened, or to the extent of interfering with any <br /> easement or access to the SCM. <br /> (4) SCM228 Repair or Reconstruction <br /> (a) Except for general landscaping and grounds maintenance, the owning <br /> entity shall notify th--Orange229 County prior to any repair or <br /> reconstruction of the SCM. <br /> (b) After notification by the owning entity, the Erosion Control Officer shall <br /> inform the owning entity of any required additions, changes or <br /> modifications and of the time period to complete said SCM230 <br /> improvements. <br /> 211 Sub-section revised to fixgrammar errors and improve readingclarity. <br /> 224 Edit(s)based on Legal Sufficiency Review comments <br /> 225 Edit(s)based on Legal Sufficiency Review comments <br /> 226 Clarification thatthis sub-section is referencingan"SCM" failure. <br /> 227 Text correction—added `or functionality". <br /> 221 Clarification that thi s sub-section is referencing"SCM" repa i r or reconstruction. <br /> 229 Consistent reference to "Orange County". <br /> 210 Clarification that improvements are specificto"SCMs" only. <br /> Orange County, North Carolina— Unified Development Ordinance Page 6-108 <br />