Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:43:22 PM
Creation date
9/29/2022 3:33:58 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 10-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Stands" <br /> Section 6.14:Stormwater Management <br /> homeowners association)ation will be assuming <br /> responsibility for all permanent SCMs, but has not yet been formed at the <br /> time of OMA recordation by the owning entity, a signed and notarized <br /> Association Declaration document <br /> --and-a revised OMA must be submitted <br /> for subsequent recordation at the Orange County Register of Deeds after <br /> the association is formed2o5 This must be ,,,,b„ t„tho The recorded <br /> version of the revised206 OMA and Association Declaration must be <br /> submitted to the Orange County Planning Department before the I QAd <br /> Disturbopq LDP may be closed, and before any remaining SCM <br /> Performance Guarantee funds <br /> Sys may be released. <br /> (f) The owner of each SCM, ,207 shall <br /> maintain it-the SCM 208 so as not to create or result in a nuisance <br /> condition. <br /> (g) Every @A9ip8@r@d 209SCM installed pursuant to this Ordinance shall be <br /> made accessible for adequate maintenance and repair by an SCM210 <br /> maintenance easement. The SCM maintenance211 easement shall be <br /> recorded at the Orange County Register of Deeds212 and 4s-the213 terms <br /> shall specify who make use of the SCM maintenance214 easement and <br /> for what purposes. <br /> (h) The owner of each @Ag'A@@r@d-215SCM shall keep records of SCM216 <br /> inspections, maintenances217, and repairs and shall submit the same <br /> upon reasonable request to the Erosion Control Officer. <br /> (2) SCM218_Operation and Maintenance Plan OMP 219 <br /> (a) 220An SCM Operation and Maintenance Plan (OMP) on and <br /> mA_,.At@PaAc;A_ plan or maRwal shall be provided by the develepe-owning <br /> entitv221 as an attachment to the OMA for each SCM in accordance with <br /> Section 6.14.10 (B) L) of this Ordinance. The OMP shall indicate fer <br /> the following: <br /> (i) What SCM222 operation and maintenance actions are needed, <br /> 205 Edit(s)based on Legal Sufficiency Review comments <br /> 216 Edit(s)based on Legal Sufficiency Review comments <br /> 207 An SCM is inherently engineered. <br /> 208 Clarification thatthe "SCM" shall bemaintained. <br /> 209 An SCM is inherently engineered. <br /> 211 Clarification that SCM maintenance easements are specificto"SCMs"only. <br /> 211 Clarification that SCM maintenance easements are specificto"SCMs"only. <br /> 212 Clarification that SCM maintenance easements must be recorded at Orange County Register of Deeds. <br /> 211 Text correction-replaced"its"with "the". <br /> 214 Clarification that SCM maintenance easements are specificto"SCMs"only. <br /> 215 An SCM is inherently engineered. <br /> 216 Clarification that records arespecificto"SCMs" only. <br /> 217 Text correction-deleted "s". <br /> 218 Clarification that SCM Operation and Maintenance Plan is specificto"SCMs" only. <br /> 219 Added the appropriate acronym for SCM Operation and Maintenance Plan(OMP)-NOTE. "OMP"is <br /> incorporated through the remainder of Section 6.14, where applicable. <br /> 210 Sub-section revised to clarifythe correct requirements forthe SCM Operation and Maintenance Plan;cross- <br /> reference to the appropriate Ordinancesection provided. <br /> 211 Consistent use of"owning entity". <br /> 222 Clarification that operation and mai ntena nce actions a respecific to"SCMs"only. <br /> Orange County, North Carolina- Unified Development Ordinance Page 6-107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.