Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:43:22 PM
Creation date
9/29/2022 3:33:58 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 10-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standar <br /> Section 6.14:Stormwater Management <br /> The Erosion Control Officer shall not issue any perms Land Disturbing Permits <br /> L( DPs)186 for new development on any land within Orange County subject to the <br /> provisions of this Section, unless and until a Stormwater Management Plan (SMP) has <br /> been reviewed and approved in accordance with Section 2.21.1 of this Ordinance. <br /> (B) Compliance with Requirements <br /> Any person engaged in new development activities as defined by this Section who fails to <br /> file a plan in accordance with this Ordinance, or who conducts any new development <br /> except in accordance with provisions of an approved SMP <br /> shall be deemed in violation of this Ordinance. <br /> (C) Enforceable Restriction <br /> Approval of the SMP shall require an enforceable <br /> restriction on property usage that runs with the land, such as a recorded deed restriction <br /> or protective covenants, to ensure that future development and redevelopment maintains <br /> the site consistent with the approved SMP. <br /> &-1496.14.10 Operation and Maintenance of Stormwater Control Measures (SCMs) <br /> (A) p^�*�of Performance Guarantee for SCMs187 <br /> —,k4-&CMsA_pproval of the SMP <br /> shall be conditioned on the posting of an SCM Performance Guarantee in accordance <br /> with Section 6.22 of this Ordinance189 <br /> if SCM construction is applicable. <br /> P A4449-.L <br /> (1') S@G irity fnr (`nn6;tr1 Artinn of R@q Wir@d ImPrQV9MQ etc 191 <br /> ( )a <br /> Permit aoolirant shall or@�A& one of the followipq as swrety for thecr� v -mv <br /> completion of required <br /> c,oW.kartible ipto c_,a_s_h -at faGe value payable to Grange County <br /> Qr4_C�2 <br /> 18e "Land Disturbing Permits"is correctly noted to match the Definitions section of this Ordinanceandthe <br /> appropriate acronym for Land Disturbing Permits(LDPs)is included—NOTE. "Land Disturbing Permit"and"LDP" <br /> are integrated through the remainder of Section 6.14,where applicable. <br /> 187 Clarification that postingoffinancial security is specific to"SCMs"only. <br /> 189 Reference to new Section 6.22. <br /> SECTION). <br /> 191 SCM Performance Guarantee requirements have been moved to Section 6.22(NEW SECTION). <br /> Orange County, North Carolina— Unified Development Ordinance Page 6-104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.