Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:43:22 PM
Creation date
9/29/2022 3:33:58 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 10-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standao'll <br /> Section 6.14:Stormwater Management <br /> (1) Allowable on-site SCMs for nutrient <br /> reduction shall include those listed in the most current version179 of the North <br /> Carolina Administrative Code Title 15A, Subchapter 02H, Sections .1000 through <br /> .1062, and the most current version of the NCDEQ Stormwater Design Manual. <br /> (2) Design, maintenance and operation of 180SCMs shall follow <br /> standards provided in the most current version181 of the North Carolina <br /> Administrative Code Title 15A, Subchapter 02H, Sections .1000 through .1062, <br /> and the most current version of the NCDEQ Stormwater Design Manual. <br /> (3) Deviations from these standards may be allowed as approved on a case by case <br /> basis. <br /> (F) Total Nutrient Removal Rates <br /> Total nutrient removal rates of SCMs, as well as SCMs in a series, will be calculated <br /> pursuant to the approved accounting tools 182. <br /> 6476.14.8 Peak Runoff Volume <br /> (A) Standards for Falls Lake Watershed <br /> (1) For all new development, there shall be no net increase in peak flow leaving the <br /> site from the pre development conditions for the 1,--year, 24--hour storm. <br /> (B) Standards for Jordan Lake Watershed <br /> (1) For all new development there shall be no net increase greater than 10% in peak <br /> flow leaving the site from the pre-development conditions consistent with 15-A <br /> NCAC 02H.1002 (44 <br /> 184 <br /> (C) Calculating Peak Runoff Volume <br /> (1) The following are acceptable methodologies for computing the pre- and post- <br /> development conditions for the 1--year, 24_-hour storm: <br /> (a) Rational Method, <br /> (b) Peak Discharge Method as described in the USDA Soil Conservation <br /> Service's Technical Release Number 55 (TR-55), <br /> (c) Alternative methods must be approved by the County. <br /> (2) The same method must be used for both the pre- and post-development <br /> conditions. <br /> 614 86.14.9 Stormwater Management Plan SMP 18s <br /> (A) Required Approval <br /> 179 Consistent reference to "most current versions"of Subchapter 02H andthe NCDEQ Stormwater Design Manual. <br /> 180 Text correction—deleted "stormwater". <br /> 181 Consistent reference to "most current versions"of Subchapter 02H andthe NCDEQ Stormwater Design Manual. <br /> 182 Text correction—added "s". <br /> 184 Reference to 15A NCAC 02H.1002 (44)is sufficient. <br /> 185 Title of Section 6.14.9 revised to includethe appropriate acronym for Stormwater Management Plans(SMPs)— <br /> NOTE. "Stormwater Management Plan"and"SMP"are integrated through the remainder of Section 6.14, <br /> where applicable. <br /> Orange County, North Carolina— Unified Development Ordinance Page 6-103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.