Orange County NC Website
Article 6: Development Standar <br /> Section 6.7: Additional Standards for MPD-CD <br /> Figure 6.7.2.A: MPD-CD Permitted Utility Adjustments <br /> Example <br /> Plan <br /> C- -. l <br /> 7 � <br /> i>o <br /> C] O Q \ <br /> Shift<50' <br /> r I+ <br /> wrww <br /> w V - <br /> p p Approved Utility Approved Stormwater Pond <br /> www Permitted Utility Adjustment Revised 5tormwaterPond <br /> Required Setback(Not Adjustable) <br /> (B) Permitted Adjustments may be approved by the Planning Director. The Master Plan shall <br /> be revised to show all permitted adjustments and filed with the Planning Department for <br /> incorporation in the approved MPD-CD. Other changes to the Master Plan shall be <br /> approved by the Board of County Commissioners in accordance with the procedures <br /> specified in Section 2.9.2 of this Ordinance. <br /> 6.7.3 Final Development Plans <br /> (A) Site plans shall be submitted subsequent to MPD-CD Master Plan approval in <br /> accordance with the procedures established in Section 2.5 of this Ordinance. <br /> (B) Approval of detailed site plans and related material is an administrative action and no <br /> public notice or hearing is required. <br /> (C) After a MPD-CD district has been established, no zoning compliance permit, permit for <br /> Lland_Disturbing Activi di=s4i iri,inn +i ri+i142 building permit, or the like, shall be issued <br /> for the site, unless and until the Planning Director has approved a site plan, prepared and <br /> approved in accordance with Section 2.5 of this Ordinance, for the development as a <br /> whole or each development lot/pod, in accordance with the approved Master Plan. <br /> (D) Approval of site plans shall be based on compliance with regulations applying at the time <br /> the land was zoned to MPD-CD. <br /> (E) The Planning Director shall certify that all conditions imposed by the Board of County <br /> Commissioners with the approval of the MPD-CD and Master Plan have been met and a <br /> report shall be provided to the County Manager within 30 days following the approval of a <br /> site plan for any property included within the MPD-CD. <br /> 6.7.4 Start of Construction & Extensions <br /> (A) Site plans shall be approved and construction started in accordance with the timetable <br /> approved with the Master Plan. If the site plan(s) have not been approved or no <br /> construction has started within the stated time frames, the Master Plan becomes void and <br /> 141 "Land-Disturbing Activity"is correctly noted to match the Definitions section of this Ordinance—NOTE. "Land- <br /> Disturbing Activity"is integrated through the remainder of Article 6,where applicable. <br /> Orange County, North Carolina— Unified Development Ordinance Page 6-35 <br />