Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:43:22 PM
Creation date
9/29/2022 3:33:58 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 10-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
163 <br /> From: Ernest Ode!-Larbi <br /> To: Christooher Sandt <br /> Cc: Patrick R.Mallett <br /> Subject: [EXTERNAL MAIL!]RE:Orange County Unified Development Ordinance Revisions-UPDATED APRIL 2022**** <br /> Date: Monday,April 18,2022 1:41:29 PM <br /> Attachments: imaae001.ono <br /> image005.ono <br /> image006.ono <br /> I have these two comments for now.I may send other comments if have other questions.Thanks. <br /> 1. The Town requires developers to post performance bond for land disturbance greater than an acre and also for installing stormwater control <br /> measures.The text in Section 2.18.1 below,specifies Orange County bond requirement.This means the developer will be posting a bond with <br /> Orange County and the Town of Chapel Hill.Developers will not be happy about it. <br /> 2. The Town's illicit discharge ordinance allow us to issue a STOP WORK ORDER.Do we need cordination with Orange County in situation where <br /> there is illicit discharge on a contruction site inorder to issue a STOP WORK ORDER? <br /> 2.18.1 Generally <br /> (A) Before commencement of any Land-Disturbina Activity in excess of the thresholds as <br /> defined in the Orange County Watershed Matrix Table (Table 4.2.10 of this Ordinance), <br /> staAiAg a:qFeateF 1haR 20,000 SqUaFe feet, EIF OFeM 18-1 1-,--0 squaFe feet it WithrA <br /> ,the owner or his/her 4w4y <br /> appeil;ted agewFinancially Responsible Party shall obtain a Land Disturbing Permit <br /> (LDP)from the Erosion Control Officer. If a permanent Stormwater Control Measure23 <br /> (SCM) is required as part of a Land-Disturbing Activity, the LDP will not be issued by the <br /> Erosion Control Officer until the owner or his/her Financially Responsible Party posts a <br /> Performance Guarantee for construction of the SCM in conformance with Section 6.22 <br /> (F)of this Ordinance.24 <br /> Ernest Odei-Larbi,PE,CFM I Senior Engineer I Stormwater Management Division <br /> Public Works Department 1208N.Columbia St.I Chapel Hill,NC 27514 <br /> Phone:919-968-27171 Fax:919-968-7276 <br /> From:Christopher Sandt<csandt@orangecountync.gov> <br /> Sent:Tuesday,April 12,2022 4:11 PM <br /> To:Ernest Odei-Larbi<eodei-larbi@townofchapelhill.org> <br /> Cc:Patrick R.Mallett<pmallett@orangecountync.gov> <br /> Subject:RE:Orange County Unified Development Ordinance Revisions-UPDATED APRIL 2022**** <br /> Importance:High <br /> External email:D.n't click links or attachments from unknown senders.To check or reportwnfh lil <br /> Hi Ernest, <br /> I'm sure you're extraordinarily busy,as we are here at the County. Apologies in advance for the additional work,but we wanted to ensure <br /> your inclusion in our impending text amendments to the Orange County Unified Development Ordinance(UDO). In follow up to Pat's <br /> notice to your office below,sent back in July 2021,we've since increased the scoping of the proposed text amendments to incorporate the <br /> state's most current Model Ordinances for all things E&SC and Stormwater,as well as the recently adopted 2021 Neuse-Tar Pamlico <br /> Rules. Frankly,this important LIDO update is long overdue. Attached for your use are: <br /> 1. a Word file of the complete LIDO,showing all proposed text amendments in TRACK CHANGES; <br /> 2. a PDF export of ONLY the affected pages within the LIDO(145 pages total); <br /> 3. a list of all the affected LIDO sections. <br /> We hope to hold the required public hearing for these proposed LIDO text amendments at the June 7,2022 BOCC meeting. So as to <br /> meet that schedule and make agenda for the associated Planning Board meeting on May 4,2022,we kindly ask that you provide any <br /> comments that the Town of Chapel Hill may have by 5pm on April 22 2022(next Friday). Sorry for the somewhat short turn-around,but <br /> alas we're at the mercy of the necessary long-lead public processes. <br /> Thanks in advance for your input. <br /> Regards, <br /> Christopher]. Sandt, P.E. <br /> Staff Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.