Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:43:22 PM
Creation date
9/29/2022 3:33:58 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 10-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 7: SubdivisiTT <br /> Section 7.4: Improvements and Performance Guarantees <br /> preliminary plat, the approved construction plan, and in accordance with applicable <br /> federal, state, and county regulations. <br /> (C) In lieu of certification from a public agency, the Planning Director is authorized to accept <br /> certification from the applicant's licensed professional engineer or licensed professional <br /> surveyor or other professional as authorized by the North Carolina General Statutes that <br /> the improvements have been installed in accordance with all applicable standards. <br /> 7.4.4 Performance Guarantees <br /> (A) In accordance with Section 2.27 of this Ordinance, a Performance <br /> Guarantee shall be required for the purpose of ensuring that subdividers properly install <br /> all required subdivision improvements in a timely manner, in accordance with approved <br /> plats and construction plans. <br /> Gredot, or c_.a_s_,h A-s-c-rov.( ;4croulcit. The form of guarantee shall be determined by4he <br /> 12252A Of thR (4940A�AtQd <br /> boon inct@ll@d by tho timo of fA@l Pl At ciihmittAl <br /> es-tomates- shall be hased on industry norms within Qran9E) GOLAntv <br /> (G) if a sUbdii.4der fails- to properly install required improverAepts %vithip the torm of thA <br /> be-r$Isasec <br /> 1 <br /> 0-nce -all of the required improvements ha�p boon at 1p_�4st 0 <br /> . . lepts required. However, oPly 01216 661Gh shall be Permitted Prior to <br /> 351 <br /> 351 All Performance Guarantee requirements are now detailed in Section 2.27 ofthe UD0. Most ofthe languageis <br /> referenced within NCGS 160A-372,which is also referenced within Section 2.27. The amendments arenecessary <br /> to streamline requirements,avoid confus i on,a nd avoid inconsistencies with State law. <br /> Orange County, North Carolina- Unified Development Ordinance Page 7-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.