Orange County NC Website
Article 6: Development StandgrM <br /> Section 6.22:Performance Guarantee Standards erformance Gurantee331F <br /> described in Section 6.14.10(6)(6) of this Ordinance. <br /> D nortif nation Soalorl bv an on inoor or Iandsr-app arnhitont (to tho ovtont <br /> rafnnS <br /> (7) If the SCM passes inspection and the Erosion Control Officer approves all of the <br /> required SCM documents as described in this Ordinance, then the Erosion <br /> Control Officer shallanW release 75%344 of the value of the SCM Performance <br /> Guarantee and shall-wW issue a Certificate of Stormwater Compliance for the <br /> SCM, subject to approval of the Planning Director who shall approve it upon <br /> receipt of a recommendation by the Erosion Control Officer.345 <br /> If tho orpoQqt passgs inS ontinn and tho Grncinn (_nntrnl Offiror anno is the <br /> Offinor shall ai ithori;zo tho roloasp of -,n to 75 of tho iW,io of tho &rmann <br /> ��.��++���� Camp!*2- Rc-n Dnrmit Or— <br /> RCfin:�� <br /> (8) If the SCM does not pass inspection and/or the submitted SCM documents are <br /> considered by the Erosion Control Officer to be incomplete, then the Erosion <br /> Control Officer shall direct the owning entity to make any necessary SCM <br /> improvements and/or to resubmit corrected documents for approval.347 Upon <br /> completion, the SCM improvements shall be re-inspected by the Erosion Control <br /> Officer. <br /> If rlofirionriec oro fnimrl tho F=PQ90nn (Vontrol Offinor Shall `-Brant that tho <br /> or a rn�Ql I loop nom lotion tho i ro�bmontS Shall ho ro_ips ortorl 344 <br /> (9) No sooner than one year after issuance of the Certificate of Stormwater <br /> Compliance for the SCM, the owning entity may petition the Planning Director to <br /> release the remaining value of the SCM Performance Guarantee. Upon receipt of <br /> said petition, the Erosion Control Officer shall inspect the SCM to determine <br /> whether the SCM is performing as designed and intended. The Erosion Control <br /> Officer shall present the petition, the SCM inspection report, and <br /> recommendations to the Planning Director. <br /> (a) If the Planning Director approves349 the petition and SCM inspection <br /> report, then the Erosion Control Officer shall release the remaining value <br /> of the SCM Performance Guarantee. <br /> If the Planning Director does not accept the petition and/or SCM <br /> inspection, then the Erosion Control Officer shall provide the owning <br /> entity with instructions to correct any SCM deficiencies necessary for the <br /> release of the remaining value of the SCM Performance Guarantee.944e <br /> tho applorApt wgy pptitmAp for tho rol oaSo of tho romaininn <br /> I Innn roroi t of Soirl otitinn tho E=rllSlnn (`nntrnl Of8nor Shall ins ort th <br /> Atonrlorl If thW11 oro tho romoininn fiinrlS Shall ho roti,rnorl If AQA the <br /> 344 Edit(s)based on Legal Sufficiency Review comments. <br /> 345 Edit(s)based on Legal Sufficiency Review comments from August 24,2022. <br /> 347 Edit(s)based on Legal Sufficiency Review comments. <br /> �Rip <br /> 349 Edit(s)based on Legal Sufficiency Review comments. <br /> Orange County, North Carolina- Unified Development Ordinance Page 6-165 <br />